My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2120 48TH ST SE 2017-06-07
>
Address Records
>
48TH ST SE
>
2120
>
2120 48TH ST SE 2017-06-07
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/7/2017 1:39:14 PM
Creation date
5/31/2017 10:44:01 AM
Metadata
Fields
Template:
Address Document
Street Name
48TH ST SE
Street Number
2120
Imported From Microfiche
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
7
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
PUBLIC w 1O RKS PERMIT Date: 2/23/2017 <br /> Public Works Permit#: PW1702-039 <br /> City of Everett Public Works Department <br /> 3200 Cedar Street Parent Permit#: <br /> Everett, WA 98201 Planning Reference#: <br /> (425) 257-8810 <br /> Public Works Fee $: $ 45.00 <br /> Other $: <br /> OWNER NAME AND ADDRESS: APPLICANT NAME AND ADDRESS: <br /> AHERN REBECCA AHERN REBECCA <br /> 2120 48TH ST SE 2120 48TH ST SE <br /> EVERETT WA 98203 EVERETT WA 98203 <br /> PHONE: 2087941327 PHONE: 2087941327 <br /> TAX PARCEL ID# 00500400102102 SITE ADDRESS: 2120 48TH ST SE <br /> INSTALL NEW DRIVEWAY OFF OF ALLEY <br /> 15' WIDE. <br /> PERMIT CONDITIONS <br /> 1. All calls for inspection shall be made 24 hours in advance. <br /> 2. All work shall be performed in accordance with the permit and current City of Everett Design and Construction Standards <br /> and Specifications. <br /> 3. Call Location Underground Service 48 hrs before you dig. TOLL FREE NUMBER 811 <br /> 4. Paving to be done per plans approved by the City of Everett Public Works h Fµ <br /> Department dated 2/23/2017. -4 <br /> 5. Contact the City of Everett Public Works Inspector Jim Knappert at 425-339-7404 r--` w <br /> prior to starting construction and with other inspection requests. [� <br /> 6. Install erosion control measures per City of Everett Standards for small parcels and <br /> remove upon completion of the project prior to final approval of the permit. 3 <br /> 7. Keep City streets clean at all times. No dirt, mud, rocks, or debris to be tracked onto ;',,',, <br /> roadway. <br /> 8. Protect all existing underground utilities during construction. ; 0 <br /> 9. Paving shall extend from garage to alley pavement. Any additional paving will require <br /> a separate permit if construction will be done after this permit is finaled. <br /> Public Works Permit Fee Breakdown- <br /> Sl <br /> " <br /> Driveway...................................................$25.00 <br /> PW Site Inspection....................................$20.00 , <br /> ACKNOWLEDGEMENT OF CONDITIONS <br /> The undersigned owner/applicant hereby agrees to hold and save harmless the <br /> City of Everett from any and all claims for damages,costs,expenses,or <br /> causes of action that may arise because of installation and maintenance of the <br /> improvement or other right-of-way use hereto applied for and further agrees to <br /> Approved for Construction Dae remove same upon notice from the City and to replace public property <br /> damage reby. <br /> FINAL INSPECTION Date oZ <br /> Approved as Constructed Sig ture o is Date <br /> WORK AUTHORIZED BY THIS PERMIT MUST BE STARTED WITHIN 180 DAYS OF DATE PERMIT IS ISSUED AND THEREAFTER IS TO BE DILIGENTLY <br /> PURSUED TO COMPLETION, THIS PERMIT MAY BE CANCELLED BY THE CITY UPON ANY STOPPAGE OF WORK ON THIS PROJECT OVER 90 DAYS DURATION. <br /> )XF(F <br />
The URL can be used to link to this page
Your browser does not support the video tag.