My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2201 100TH ST SW AURORA DOOR 2017-06-30
>
Address Records
>
100TH ST SW
>
2201
>
AURORA DOOR
>
2201 100TH ST SW AURORA DOOR 2017-06-30
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/30/2017 2:51:04 PM
Creation date
5/31/2017 1:43:51 PM
Metadata
Fields
Template:
Address Document
Street Name
100TH ST SW
Street Number
2201
Tenant Name
AURORA DOOR
Imported From Microfiche
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
8
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
FOR OFFICE USE ONLY PERMIT# <br /> BUILDING PLANNING <br /> Bidg/TI/Addn/Rem Size Zoning Classification <br /> Garage Size Overlay/Agreement <br /> VALUATION Nonresidential Use <br /> Number of Stories Residential Use <br /> Occupancy Group Proposed No. of Dwelling Units: <br /> Occupant Load Total No. of Dwelling Units: <br /> Basement Yes_ No_Fin/Unf Landscape or Planning Inspection <br /> Type of Construction needed before final? . Yes No_ <br /> Existing Sprinkler system? Yes_ No_Unk Planning Inspector: <br /> Fire Sprinkler Required Yes No Phone#: <br /> Reason Approved by: <br /> Date: <br /> Existing Fire Alarm Yes No_Unk_ Historic Approved by: Date: <br /> Fire Alarm Required Yes_ No_ School Mitigation Reqd? Yes No <br /> Reason Everett School Dist Mukilteo School Dist <br /> Enclosure Law Applies Yes #of Net New Units: <br /> Deferred Submittal Req'd Yes No <br /> Approved by: Date: Calculated School Impact Fee: <br /> Comments: School Impact Fee Credit: <br /> Total School Impact Fee Owed: <br /> Comments: <br /> FEES PUBLIC WORKS <br /> Plan Check Fee Intake Checked By: Date: <br /> Building Permit Intake Comments: <br /> Surcharge <br /> Additional Plan Check PW Permit Application Submitted? Yes No <br /> Plumbing Fee PW Worksheet Required? Yes No <br /> Mechanical Fee PW REVIEW: PW Reviewer: Date: <br /> Ping Bldg Review Fee SEE PW WORKSHEET-returned to file <br /> Water Fee PW Permit Approved, PW Permit Not Required <br /> Sewer Fee <br /> Systems Dev. Fee FIRE DEPARTMENT <br /> Traffic Mitigation Fee Update/New Sprinklers IYes_ No_ Existing Bldg._ <br /> Public Works Fee Update/New Detection I Yes No Existing Bldg. <br /> School Mitigation Fee Update/New Chemical Yes— No ng Bldg.— <br /> Update/New Fire SlIrvi4eYes— No Exisfing Bldg. <br /> Approved by: Date: -I y-1(� <br /> Comments: <br />
The URL can be used to link to this page
Your browser does not support the video tag.