My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
1810 104TH ST SE A T AND T WIRELESS ANTENNA 2022-12-02
>
Address Records
>
104TH ST SE
>
1810
>
A T AND T WIRELESS ANTENNA
>
1810 104TH ST SE A T AND T WIRELESS ANTENNA 2022-12-02
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
9/19/2018 10:52:32 AM
Creation date
5/31/2017 2:07:30 PM
Metadata
Fields
Template:
Address Document
Street Name
104TH ST SE
Street Number
1810
Tenant Name
A T AND T WIRELESS ANTENNA
Notes
GEOTECHNICAL REPORT INCLUDED
Imported From Microfiche
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
52
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Geotechnical Engineering W44"-rt Irerracon <br /> SN4924—Silver Lake North Cell Tower Everett, Washington <br /> October 24, 2014 Terracon Project No. 81145043 <br /> performed using a meter manufactured by Advanced Geosciences, Inc. The Wenner <br /> arrangement (equal electrode spacing) was used with the "a" spacing incrementally increasing <br /> from 5 to 20 feet. Results of the soil resistivity measurements are presented in the table below. <br /> Interpretation of the data from this survey was not included in the requested scope of services for <br /> this project. <br /> Results of the Soil Resistivity Measurements <br /> Test Direction a= 5 feet 10 feet 15 feet 20 feet <br /> North-South p(OHM-FT) 711.3 1,004 978.0 929.8 <br /> (measured) <br /> p(OHM-CM) 21,680 30,602 29,809 28,340 <br /> East-West p(OHM-FT) <br /> 1,024 1,044 762.4 544.0 <br /> (measured) <br /> p(OHM-CM) 31,212 31,821 23,238 16,581 <br /> 5.0 GENERAL COMMENTS <br /> Terracon should be retained to review the final design plans and specifications so comments <br /> can be made regarding interpretation and implementation of our geotechnical recommendations <br /> in the design and specifications. Terracon also should be retained to provide observation and <br /> testing services during grading, excavation, foundation construction and other earth-related <br /> construction phases of the project. <br /> The analysis and recommendations presented in this report are based upon the data obtained <br /> from the boring performed at the indicated location and from other information discussed in this <br /> report. This report does not reflect variations that may occur across the site, or due to the <br /> modifying effects of construction or weather. The nature and extent of such variations may not <br /> become evident until during or after construction. If variations appear, we should be immediately <br /> notified so that further evaluation and supplemental recommendations can be provided. <br /> The scope of services for this project does not include either specifically or by implication any <br /> environmental or biological (e.g., mold, fungi, bacteria) assessment of the site or identification or <br /> prevention of pollutants, hazardous materials or conditions. If the owner is concerned about the <br /> potential for such contamination or pollution, other studies should be undertaken. <br /> This report has been prepared for the exclusive use of our client for specific application to the <br /> project discussed and has been prepared in accordance with generally accepted geotechnical <br /> engineering practices. No warranties, either express or implied, are intended or made. Site <br /> Responsive■ Resourceful■ Reliable 11 <br />
The URL can be used to link to this page
Your browser does not support the video tag.