Laserfiche WebLink
INSPECTION REPORT <br /> Date r�� Permit:e, I V Z <br /> Contractor: lv` d po ot a <br /> Owner: <br /> Site Address: l <br /> `,^\ TYPE OF INSPECTION REQUESTED <br /> ELECTRICAL BUILDING MECHANICAL PLUMBING <br /> ❑Temp Service ❑UFER ground ❑Groundwork/Slab ❑Groundwork/Slab <br /> ❑Groundwork ❑Footing ❑Rough In ❑Rough In <br /> ❑Slab/Conduit ❑Foundation ❑Ceiling Grid ❑Ceiling Grid <br /> ❑Rough In ❑Structural Slab ❑OK to insulate ❑OK to insulate <br /> ❑Service ❑Framing ❑Rooftop Units ❑Water Service <br /> ❑ g F]Insulation ❑Mechanical Final E]Medical Gas <br /> eiling Gr F-1DrywallNailing ❑Plumbing Final <br /> tar-trical Fin I ❑Shear Nailing GAS PIPE <br /> E WOR ❑Roof Nailing ❑Rough In/Service Hot Water Tank <br /> rains ❑Ceiling Grid ❑Refrigeration ❑Rough in <br /> ❑Roof drains ❑Building Final ❑Gas Pipe Final ,❑HWT Final <br /> OTI-2 'O CONSULTATION: � (�- _fib�to Ll`"� <br /> ❑ APPROVAL ❑ PARTIAL APPROVAL FINAL APPROVAL THIS P RMIT <br /> ❑ OK FOR T.C.O. ❑ CORRECTION REQUESTED <br /> ❑ OK FOR C.O. ❑ VIOLATION <br /> ❑ UNABLE TO PERFORM INSPECTION: <br /> ❑ CALL(425)257-8881 FOR REINSPECTION-24 hour notice required <br /> Inspector: Date: <br /> EIR(10/06) DATABAR,INC. <br />