Laserfiche WebLink
INSPECTION REPORT <br /> Date: ( Permit: <br /> Contractor: _F " <br /> 2 Owner: <br /> Site Address: "� 1 1 ` r� <br /> TYPE OF INSPECTION REQUESTED <br /> ELECTRICAL BUILDING PLUMBING <br /> ❑Temp Service ❑LIFER ground ❑ Groundwork/Slab ❑ Groundwork/Slab <br /> ❑Groundwork ❑Footing ❑ Rough In ❑ Rough In <br /> ❑Slab/Conduit ❑Foundation ❑ Ceiling Grid ❑ Ceiling Grid <br /> ❑Rough In ❑Structural Slab ❑ OK to insulate ❑ OK to insulate <br /> ❑Service ❑Framing ❑ Rooftop Units ❑Water Service <br /> ❑Grounding ❑Insulation ❑ Mechanical Final ❑ Medical Gas <br /> ❑Ceiling Grid ❑Drywall Nailing ❑ Plumbing Final <br /> ❑Electrical Final ❑Shear Nailing GAS PIPE <br /> SITE WORK ❑Roof Nailing ❑Rough In/Service Hot Water Tank <br /> ❑Footing drains ❑Ceiling Grid ❑Refrigeration ❑ Rough In <br /> ❑Roof drains ❑Building Final Gas Pipe Final 1 I HWT Final <br /> OTHER OR CONSULTATION:-0 9S <br /> ❑ APPROVAL PARTIAL APPROVAL FINAL APPROVAL THIS PERMIT <br /> ❑ OK FOR T.C.O. RRECTION REQUESTED <br /> ❑ OK FOR C.O. VIOLATION F I <br /> F] UNABLE TO PERFOR INSPECTION: <br /> ❑ CALL(425)257-8881 FOR REINSPECTION-24 hour notice required <br /> C` <br /> OA-4 b6,16T <br /> Inspector: Date: <br /> l `! <br /> EIR(4/09) <br />