My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Reece Construction Company Inc. 5/24/2017
>
Contracts
>
Capital Contract
>
Reece Construction Company Inc. 5/24/2017
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/5/2017 10:39:05 AM
Creation date
6/5/2017 10:37:28 AM
Metadata
Fields
Template:
Contracts
Contractor's Name
Reece Construction Company Inc.
Approval Date
5/24/2017
Council Approval Date
5/3/2017
Department
Public Works
Department Project Manager
Richard Hefti
Subject / Project Title
Water Main Replacement R UP3646
Public Works WO Number
UP3646
Tracking Number
0000659
Total Compensation
$1,382,407.59
Contract Type
Capital Contract
Retention Period
10 Years Then Transfer to State Archivist
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
332
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
CITY OF EVERETT SPECIAL PROVISIONS <br /> 1-08.6 Suspension of Work <br /> Supplement 1-08.6 by adding the following: <br /> 1-08.6(1) Suspension Procedures <br /> (******) <br /> The City may, at its convenience and at any time and without cause, suspend all or <br /> any part of the Work by notice in writing to the Contractor. The Contractor shall <br /> resume the Work within five calendar days after receiving written notice from the City <br /> to do so. The Contractor will be allowed an increase in the Contract Sum or an <br /> extension of Contract Time, or both, directly attributable to any suspension in <br /> accordance with the Change Order procedures in these Special Provisions; provided, <br /> the Contractor shall not be entitled to any increase to the extent caused by the <br /> Contractor. <br /> 1-08.7 Maintenance During Suspension <br /> Delete all of 1-08.7 and substitute the following: <br /> Before and during any suspension (as described in Section 1-08.6) the Contractor <br /> shall protect the Work from damage or deterioration. Suspension shall not relieve the <br /> Contractor from anything the Contract requires unless this Section states otherwise. <br /> At no expense to the City, the Contractor shall provide through the construction area a <br /> safe, smooth, and unobstructed roadway, sidewalk, and path for public use during <br /> suspension, as required in 1-07.23 PUBLIC CONVENIENCE AND SAFETY. This may <br /> require a temporary road or detour. <br /> If the Engineer determines that the Contractor failed to pursue the Work diligently <br /> before the suspension, or failed to comply with the Contract or orders, then the <br /> Contractor shall maintain the temporary roadway, sidewalk, and path in use during <br /> suspension. In this case, the Contractor shall bear the maintenance costs. If the <br /> Contractor fails to maintain the temporary roadway, sidewalk, and path the City will do <br /> the Work and deduct all resulting costs from payments due to the Contractor. <br /> If the Engineer determines that the Contractor has pursued the Work diligently before <br /> the suspension, then the City will maintain the temporary roadway, sidewalk, and path <br /> (and bear its cost). This City-provided maintenance work will include only routine <br /> maintenance of: <br /> 1. The Traveled Way, Auxiliary Lanes, Shoulders, detour surface, sidewalks, and <br /> paths, <br /> 2. Roadway drainage along and under the traveled Roadway, sidewalk, path or <br /> detour, and <br /> 3. All barricades, signs, and lights needed for directing traffic through the <br /> temporary Roadway, sidewalk, path or detour in the construction area. <br /> The Contractor shall protect and maintain all other Work in areas not used by traffic. <br /> All costs associated with protecting and maintaining such Work shall be the <br /> responsibility of the Contractor except those costs associated with implementing the <br /> TESC Plan according to Section 8-01. <br /> After suspension during which the City has done the routine maintenance, the <br /> Contractor shall accept the traveled Roadway, sidewalk, path or detour as is when <br /> Work resumes. The Contractor shall make no claim against the City for the condition <br /> of the Roadway or detour. <br /> After any suspension, the Contractor shall resume all responsibilities the Contract <br /> assigns for the Work. <br /> Water Main Replacement R Division 1 —GENERAL REQUIREMENTS March 1, 2017 <br /> WO No—UP3646 SP—94 <br />