CITY OF EVERETT SPECIAL PROVISIONS <br /> Measurement for saw-cutting will be per linear foot along the true length of the surface cut. <br /> The unit price per lineal foot for the final saw-cutting of asphalt concrete pavement, up to 6- <br /> inch thickness, shall be full compensation for all labor, material, tools, and equipment <br /> necessary to satisfactorily complete the Work as specified in Section 2-02.3(3) of the <br /> Standard Specifications, these Special Provisions and as shown on the Plans. The unit <br /> price per lineal foot for the final saw-cutting of asphalt concrete pavement, up to 6-inch <br /> thickness includes, but is not limited to, the saw-cutting necessary for the final joint <br /> between existing pavement and permanent HMA pavement. <br /> Include cost of cleanup by vacuum collection and disposal of the cuttings slurry with this bid <br /> item as there will be no separate payment for cleanup. <br /> Bid Item 11 - Saw-Cutting Concrete Curb and Gutter and Sidewalk <br /> Measurement and Payment: Unit Price per Linear Foot (LF) <br /> Measurement for saw-cutting will be per linear foot along the true length of the surface cut. <br /> The unit price per lineal foot for the final saw-cutting of concrete curb and gutter and <br /> sidewalk, shall be full compensation for all labor, material, tools, and equipment necessary <br /> to satisfactorily complete the Work as specified in Section 2-02.3(3) of the Standard <br /> Specifications, these Special Provisions and as shown on the Plans. The unit price per <br /> lineal foot for the final saw-cutting of concrete curb and gutter and sidewalk includes, but is <br /> not limited to, the saw-cutting necessary for the final joint between existing concrete <br /> pavement and permanent concrete surface repair. <br /> Include cost of cleanup by vacuum collection and disposal of the cuttings slurry with this bid <br /> item as there will be no separate payment for cleanup. <br /> Bid Item 12 - Foundation Material, Class A or B <br /> Measurement and Payment: Unit Price per Ton (TON) <br /> Measurement for Foundation Material, Class A or B shall be by the ton, recorded on <br /> certified weight tickets in accordance with 1-09.2 WEIGHING EQUIPMENT, and placed <br /> within the limits of dimensions defined in the Work, descriptions for other bid items, shown <br /> on the Plans, or COE Standard Drawings, or as otherwise approved by the Engineer. <br /> The unit price bid per ton shall constitute full compensation for all labor, tools, materials and <br /> equipment required to furnish, place, and compact foundation material as specified in the <br /> Standard Specifications, these Special Provisions and as shown on COE Standard <br /> Drawing No. 610. <br /> The unit price for this bid item includes all costs for dewatering and over-excavation, <br /> removal, haul, and disposal of unsuitable subgrade material below the pipe zone or <br /> roadway subgrade. <br /> Bid Item 13 - Gravel Borrow <br /> Measurement and Payment: Unit Price per Ton (TON) <br /> Measurement for Gravel Borrow shall be by the ton, recorded on certified weight tickets in <br /> accordance with 1-09.2 WEIGHING EQUIPMENT, and placed within the limits of <br /> dimensions defined in the Work, descriptions for other bid items, shown on the Plans, or <br /> COE Standard Drawings, or as otherwise approved by the Engineer. <br /> Measurement for gravel borrow shall be limited to maximum trench widths defined in the <br /> work descriptions for other bid items. <br /> The unit price per ton, based on certified weight tickets, for gravel borrow shall be full <br /> compensation for all labor, material, tools and equipment necessary to furnish imported <br /> gravel borrow for trench backfill where Engineer has determined native soils are not <br /> Water Main Replacement"R" Division B—BID DESCRIPTIONS March 1, 2017 <br /> WO No.—UP3646 SP -6 <br />