Laserfiche WebLink
CITY OF EVERETT SPECIAL PROVISIONS <br /> Note: Unit prices for all items,all extensions,and the total amount bid must be shown. Where conflict occurs between the unit price and <br /> the total amount named for any item,the unit price shall prevail,and totals shall be corrected to conform thereto. All entries must be <br /> typed or entered in ink <br /> BID SCHEDULE <br /> BIDDER: Reece Construction Company <br /> Item ITEM DESCRIPTION Unit Qid UNIT PRICE TOTAL AMOUNT <br /> 1 Mobilization LS 1 $67,000 00 $ 67,000 00 <br /> 2 Surveying LS 1 $11,000 . 00 $ 11,000 , 00 <br /> 3 SPCC Plan LS 1 $ soo . oo $ 500 .00 <br /> 4 Force Account FA 1 $ 40,000.00 $ 40,000.00 <br /> 5 Traffic Control Labor HR 800 $ 55 .00 $ 44,000 . 00 <br /> 6 Maintenance and Protection of Traffic Control LS 1 $14,000 00 $ 14,000 . 00 <br /> 7 Trench Excavation Safety Systems LS 1 $ 575 , 00 $ 575 ,00 <br /> 8 Street Cleaning &Sweeping HR 56 $ 150 ,00 $ 8,400 ,00 <br /> 9 Erosion/Water Pollution Control FA 1 $ 3,000.00 $ 3,000.00 <br /> Sawcutting Asphalt Concrete Pavement, Final <br /> 10 Joint Cut up to 6-in LF 12800 $ 0 60 $ 7,680 00 <br /> 11 Sawcutting Concrete Curb &Gutter&Sidewalk LF 1890 $ 1 00 $ 1,890 00 <br /> 12 Foundation Material, Class A or B TON 380 $ 10.00 $ 3,800 00 <br /> 13 Gravel Borrow TON 3000 $ soo $ 15,000 00 <br /> 14 Temporary Pavement Patch SY 4900 $ 1 , 25 $ 6,125 , 00 <br /> WATER MAIN REPLACMENT"R" Division P—PROPOSAL April 7,2017 <br /> Work Order No.—UP3646 SP—15 Addendum 1 <br /> P Tided to Builders Exchange of WA, Inc. For usage Conditions Agreement see www.bxwa.com - Always Verify Scal <br />