My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Reece Construction Company Inc. 5/24/2017
>
Contracts
>
Capital Contract
>
Reece Construction Company Inc. 5/24/2017
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/5/2017 10:39:05 AM
Creation date
6/5/2017 10:37:28 AM
Metadata
Fields
Template:
Contracts
Contractor's Name
Reece Construction Company Inc.
Approval Date
5/24/2017
Council Approval Date
5/3/2017
Department
Public Works
Department Project Manager
Richard Hefti
Subject / Project Title
Water Main Replacement R UP3646
Public Works WO Number
UP3646
Tracking Number
0000659
Total Compensation
$1,382,407.59
Contract Type
Capital Contract
Retention Period
10 Years Then Transfer to State Archivist
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
332
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
CITY OF EVERETT SPECIAL PROVISIONS <br /> be rejected. No oral, electronic, fax, telegraphic, or telephonic proposals or <br /> modifications will be considered. <br /> 1-02.7 Bid Deposit <br /> Supplement 1-02.7 by adding the following: <br /> Bid deposit shall serve as evidence of good faith and as a guarantee that if awarded <br /> the Contract the Bidder will execute the Contract and provide bonds as required by the <br /> Bid. Should the successful Bidder fail to enter into the Contract, furnish a satisfactory <br /> performance and payment bond, and furnish evidence of insurance within 14 calendar <br /> days after the Award Date, the certified check, cashier's check or bid bond shall be <br /> forfeited as liquidated damages. <br /> Bid bonds shall contain the following: <br /> 1. City-assigned number for the Project; <br /> 2. Name of the Project; <br /> 3. The City of Everett named as obligee; <br /> 4. The amount of the bid bond stated either as a dollar figure or as a percentage <br /> that represents five percent of the maximum bid amount that could be <br /> awarded; <br /> 5. Signature of the Bidder's officer empowered to sign official statements. The <br /> signature of the person authorized to submit the Bid should agree with the <br /> signature on the bond, and the title of the person must accompany the said <br /> signature; <br /> 6. The signature of the surety's officer empowered to sign the bond and the <br /> power of attorney. <br /> Bidder shall use the bond form included in the Bid Documents. <br /> 1-02.8 Noncollusion Declaration and Lobbying Certification <br /> 1-02.8(1) Noncollusion Declaration <br /> Supplement 1-02.8(1) by adding the following: <br /> The City has determined every Bidder must submit a Non-Collusion Affidavit for <br /> every Project. Accordingly, the Bidder shall submit a "Non-Collusion Affidavit", <br /> contained in the Contract Documents, as part of the Proposal package. If the <br /> City has reason to believe that collusion exists among Bidders, the City will reject <br /> the Bids of the known participants in such collusion and may, at its option, require <br /> that all Bidders certify under penalty of perjury, that no collusion has occurred or <br /> exists. <br /> 1-02.9 Delivery of Proposal <br /> Delete all of 1-02.9 and substitute the following: <br /> Bidder shall submit Bidder's Proposal in a sealed opaque envelope that clearly and <br /> legibly notes the Project Name, the time and date of the bid opening, and the Bidder's <br /> name and address on the outside of the envelope. <br /> The City will not open or consider any Proposal or any supplement to a Proposal that <br /> is received after the time specified for receipt of Proposals, or received in a location <br /> other than that specified for receipt of Proposals. <br /> 1-02.10 Withdrawaling, Revising, or Supplementing Proposal <br /> Delete 1-02.10 and substitute with the following: <br /> After submitting a physical Bid Proposal to the City, the Bidder may withdraw, revise, or <br /> supplement it if: <br /> Water Main Replacement R Division 1 —GENERAL REQUIREMENTS March 1, 2017 <br /> WO No—UP3646 SP—41 <br />
The URL can be used to link to this page
Your browser does not support the video tag.