My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Reece Construction Company Inc. 5/24/2017
>
Contracts
>
Capital Contract
>
Reece Construction Company Inc. 5/24/2017
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/5/2017 10:39:05 AM
Creation date
6/5/2017 10:37:28 AM
Metadata
Fields
Template:
Contracts
Contractor's Name
Reece Construction Company Inc.
Approval Date
5/24/2017
Council Approval Date
5/3/2017
Department
Public Works
Department Project Manager
Richard Hefti
Subject / Project Title
Water Main Replacement R UP3646
Public Works WO Number
UP3646
Tracking Number
0000659
Total Compensation
$1,382,407.59
Contract Type
Capital Contract
Retention Period
10 Years Then Transfer to State Archivist
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
332
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
CITY OF EVERETT SPECIAL PROVISIONS <br /> recommendation to the City. If the City concurs in the claim of error, the Bidder will be <br /> relieved of responsibility, and the bid deposit of the Bidder will be returned. Thereafter, <br /> at the discretion of the City, all Bids may be rejected or Award made to next lowest and <br /> responsive Bidder. <br /> 1-03.1(1) Identical Bid Totals <br /> (January 4, 2016 APWA GSP) <br /> Revise to read as follows: <br /> After opening Bids, if two or more lowest responsive Bid totals are exactly equal, <br /> then the tie-breaker will be the Bidder with an equal lowest bid, which proposed <br /> to use the highest percentage of recycled materials in the Project, per the form <br /> submitted with the Bid Proposal. If those percentages are also exactly equal, <br /> then the tie-breaker will be determined by drawing as follows: Two or more slips <br /> of paper will be marked as follows: one marked "Winner" and the other(s) marked <br /> "unsuccessful". The slips will be folded to make the marking unseen. The slips <br /> will be placed inside a box. One authorized representative of each Bidder shall <br /> draw a slip from the box. Bidders shall draw in alphabetic order by the name of <br /> the firm as registered with the Washington State Department of Licensing. The <br /> slips shall be unfolded and the firm with the slip marked "Winner" will be <br /> determined to be the successful Bidder and eligible for Award of the Contract. <br /> Only those Bidders who submitted a Bid total that is exactly equal to the lowest <br /> responsive Bid, and with a proposed recycled materials percentage that is <br /> exactly equal to the highest proposed recycled materials amount, are eligible to <br /> draw. <br /> Supplement 1-03.1 by adding the following: <br /> 1-03.1(2) Preference for Resident Contractors <br /> In accordance with RCW 39.04.380, if a Bid is received from a nonresident contractor <br /> from a state that provides a percentage bidding preference and does not have an <br /> office located in Washington, then a comparable percentage disadvantage will be <br /> applied to the Bid of that nonresident contractor. <br /> 1-03.2 Award of Contract <br /> Revise 1-03.2 to read as follows: <br /> Within 45 days after the opening of Bids, the City will act either to accept the Bid from <br /> the lowest responsive, responsible Bidder, or to reject all Bids. The City reserves the <br /> right to request extensions of such Bid acceptance period. If the lowest responsible <br /> Bidder and the City cannot agree on an extension by the 45 day deadline, the City <br /> reserves the right to award the Contract to the next lowest responsible Bidder or reject <br /> all Bids. <br /> The acceptance of a Bid will be evidenced by a written Notice of Award of Contract <br /> delivered in person or by certified mail to the Bidder whose Bid is accepted, together <br /> with a request to furnish a Contract Bond and evidence of insurance and to execute <br /> the Contract set forth in the Contract Documents. <br /> 1-03.3 Execution of Contract <br /> Revise the first paragraph of 1-03.3 to read as follows: <br /> Successful Bidder has 14 calendar days after receiving the Notice of Award to submit <br /> the following documents to the City: <br /> • Two (2) executed copies of the Contract. <br /> Water Main Replacement R Division 1 —GENERAL REQUIREMENTS March 1, 2017 <br /> WO No—UP3646 SP—44 <br />
The URL can be used to link to this page
Your browser does not support the video tag.