CITY OF EVERETT SPECIAL PROVISIONS <br /> 1-04 SCOPE OF THE WORK <br /> 1-04.1 Intent of the Contract <br /> Supplement 1-04.1 by adding the following: <br /> 1-04.1(3) Specifications and Plans <br /> 1-04.1(3)A Interpretation of Specifications and Plans <br /> The Specifications and Plans are intended to be explanatory and supportive of <br /> each other. Work specified on the Plans and not in the Specifications, or vice <br /> versa, shall be executed as if specified in both. In the event the Work to be done <br /> or matters relative thereto are not sufficiently detailed or explained in the <br /> Contract Documents, the Contractor shall immediately ask the City's <br /> Representative for further explanation and shall comply with such explanation. In <br /> the event of doubt or question arising respecting the true meaning of the <br /> Specifications or Plans, Contractor shall refer to the City's Representative for its <br /> decision. <br /> 1-04.1(3)B Division of Specifications and Plans <br /> Specifications and Plans are divided into groups for convenience. These <br /> divisions are not for the purpose of apportioning Work or responsibility for Work <br /> among Subcontractors, Suppliers and manufacturers. The Contractor is <br /> responsible for all Work shown or described, regardless of location(s) in the <br /> Contract Documents. <br /> 1-04.1(3)C Discrepancies in Specifications and Plans <br /> 1-04.1(3)C(1) Errors and Omissions <br /> If the Contractor becomes aware of any errors or omissions in the Contract <br /> Documents or in the City's field work, it shall immediately inform the City's <br /> Representative in writing. The City's Representative will promptly review the <br /> matter and if it finds an error or omission has been made; it will determine the <br /> corrective actions and advise the Contractor accordingly. If the corrective <br /> work associated with an error or omission increases or decreases the amount <br /> of Work called for in the Contract, the City will issue an appropriate Change <br /> Order. After discovery by the Contractor of an error or omission, related Work <br /> performed by the Contractor shall be done at its risk unless authorized by the <br /> City's Representative and approved by the City. <br /> 1-04.1(3)C(2) Conflicting Provisions <br /> In the event an item of Work is described differently in two or more locations <br /> on the Plans, in the Specifications and Special Provisions, the Contractor <br /> shall, upon request of the City's Representative, submit in writing to the City's <br /> Representative the description upon which the Contractor relied in preparing <br /> its Bid or laying out the Work. <br /> 1-04.1(3)D Utilities <br /> 1-04.1(3)D(1) General <br /> The City has endeavored to determine the existence of public and private <br /> utilities at the site of the Work from the records of the owners of known <br /> utilities in the vicinity of the Work. The positions of these utilities as derived <br /> from such records are shown on the Plans. Unless otherwise noted, no <br /> excavations were made to verify the locations shown for underground utilities. <br /> The service connections to the gas, electric, cable TV and communication <br /> utilities are not shown on the Plans. Refer to 1-07.17 UTILITIES AND <br /> Water Main Replacement R Division 1 —GENERAL REQUIREMENTS March 1, 2017 <br /> WO No—UP3646 SP-46 <br />