My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Reece Construction Company Inc. 5/24/2017
>
Contracts
>
Capital Contract
>
Reece Construction Company Inc. 5/24/2017
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/5/2017 10:39:05 AM
Creation date
6/5/2017 10:37:28 AM
Metadata
Fields
Template:
Contracts
Contractor's Name
Reece Construction Company Inc.
Approval Date
5/24/2017
Council Approval Date
5/3/2017
Department
Public Works
Department Project Manager
Richard Hefti
Subject / Project Title
Water Main Replacement R UP3646
Public Works WO Number
UP3646
Tracking Number
0000659
Total Compensation
$1,382,407.59
Contract Type
Capital Contract
Retention Period
10 Years Then Transfer to State Archivist
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
332
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
CITY OF EVERETT SPECIAL PROVISIONS <br /> 2-09.3 Construction Requirements 136 <br /> 2-09.4 Measurement 137 <br /> 2-09.5 Payment 137 <br /> 2-11 TRIMMING AND CLEANUP 138 <br /> 2-11.3 Construction Requirements 138 <br /> 2-11.4 Vacant 138 <br /> 2-11.4 Measurement 138 <br /> 2-11.5 Payment 138 <br /> DIVISION 4 - BASES 141 <br /> 4-04 BALLAST AND CRUSHED SURFACING 141 <br /> 4-04.1 Description 141 <br /> 4-04.3 Construction Requirements 141 <br /> 4-04.4 Measurement 141 <br /> 4-04.5 Payment 141 <br /> 4-06 ASPHALT TREATED BASE (ATB) 141 <br /> 4-06.1 Description 141 <br /> 4-06.2 Materials 142 <br /> 4-06.3 Construction Requirements 142 <br /> 4-06.4 Measurement 144 <br /> 4-06.5 Payment 144 <br /> DIVISION 5 - SURFACE TREATMENTS AND PAVEMENTS 141 <br /> 5-04 HOT MIX ASPHALT 141 <br /> 5-04.3 Construction Requirements 141 <br /> 5-04.4 Measurement 142 <br /> 5-04.5 Payment 143 <br /> 5-06 PAVEMENT PATCHING (******) 143 <br /> 5-06.1 Description 143 <br /> 5-06.2 Materials 143 <br /> 5-06.3 Construction Requirements 143 <br /> 5-06.4 Measurement 145 <br /> 5-06.5 Payment 145 <br /> DIVISION 7 - DRAINAGE STRUCTURES, STORM SEWERS, SANITARY SEWERS, WATER <br /> MAINS, AND CONDUITS 147 <br /> 7-08 GENERAL PIPE INSTALLATION REQUIREMENTS 147 <br /> 7-08.1 Description 147 <br /> 7-08.2 Materials 147 <br /> 7-08.3 Construction Requirements 147 <br /> 7-08.4 Measurement 150 <br /> 7-08.5 Payment 150 <br /> 7-09 WATER MAINS 150 <br /> 7-09.1 Description 150 <br /> 7-09.2 Materials 151 <br /> 7-09.3 Construction Requirements 151 <br /> Watermain Replacement"R" Table of Contents - March 1, 2017 <br /> WO No. -UP3646 SP -v <br />
The URL can be used to link to this page
Your browser does not support the video tag.