CITY OF EVERETT SPECIAL PROVISIONS <br /> Supplement 1-05.3 as follows: <br /> The Contract Documents include Plans that show such details as are reasonably <br /> necessary to give a comprehensive understanding of the Work. The Contractor shall <br /> submit alterations affecting the requirements and information in the Plans in writing to <br /> the Engineer for approval prior to performing such Work. <br /> The Engineer may supplement the Plans with additional drawings and explanations, <br /> consistent with the purpose and intent of the original Plans, to detail and illustrate the <br /> Work. The Contractor shall perform the Work according to these supplemental <br /> drawings and explanations. <br /> In addition to supplemental drawings furnished by the Engineer, the Contract <br /> Documents may also be supplemented by Type 1, Type 2 or 2E, and Type 3 or 3E <br /> Working Drawings prepared by the Contractor, material supplier, or manufacturer, <br /> when necessary or as required by the Contract Documents to detail and illustrate <br /> portions of the Work. All types of Working Drawings shall be reviewed by the Engineer <br /> before work pursuant to those Working Drawings is performed. Type 3 and 3E <br /> Working Drawings may include, and not be limited to, shop details, erection plans, <br /> masonry lay-out diagrams, reinforcing steel and bending diagrams, post tensioning <br /> plans, shoring, cribbing, cofferdam, or falsework plans, formwork plans, or hydraulic <br /> items. Type 2 and 2E Working Drawings may include, and not be limited to, Catalog <br /> cuts or standard plans for commonly used manufactured items. <br /> The Contractor shall be fully responsible for the accuracy of dimensions and details on <br /> Working Drawings, and for complete conformity with the Contract Documents, even if <br /> the Working Drawings have been approved by the Engineer, or if the Contractor and <br /> the Engineer agree on dimensions and details. The City does not accept Working <br /> Drawings as accurate or adequate, and does not take responsibility for, or warrant that <br /> Working Drawings will meet Contract requirements. <br /> Engineer's review of Working Drawings shall not relieve Contractor from responsibility <br /> for variation from the requirements of the Contract Documents unless Contractor has <br /> in writing called the Engineer's attention to each such variation at the time of <br /> submission, and the Engineer has given written approval of each such variation by a <br /> specific written notation thereof incorporated in or accompanying the returned Working <br /> Drawing; nor will review by Engineer relieve Contractor from responsibility for errors or <br /> omissions in the Working Drawings or from responsibility for having complied with the <br /> provisions of this section. <br /> Submittal requirements may be found in 1-05.3(1) or elsewhere in these Special <br /> Provisions. <br /> Deviations from Standard Plans will be subject to a Working Drawing submitted by the <br /> Contractor and approved by the Engineer. Where a Working Drawing is required by <br /> the Specifications, related Work performed prior to completion of the Engineer's review <br /> of the pertinent submission will be the sole expense and responsibility of the <br /> Contractor. <br /> Supplement 1-05.3 by adding the following: <br /> 1-05.3(1) Submittals <br /> (******) <br /> Where required by the Contract Documents, the Contractor shall submit information, <br /> such as Working Drawings that will enable the City's Representative to advise the City <br /> whether the Contractor's proposed materials, Equipment or methods of work are in <br /> general conformance to the design concept and in compliance with the Plans and <br /> Specifications,. Approval or acceptance of a Submittal does not relieve Contractor <br /> Water Main Replacement R Division 1 —GENERAL REQUIREMENTS March 1, 2017 <br /> WO No—UP3646 SP-54 <br />