My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Reece Construction Company Inc. 5/24/2017
>
Contracts
>
Capital Contract
>
Reece Construction Company Inc. 5/24/2017
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/5/2017 10:39:05 AM
Creation date
6/5/2017 10:37:28 AM
Metadata
Fields
Template:
Contracts
Contractor's Name
Reece Construction Company Inc.
Approval Date
5/24/2017
Council Approval Date
5/3/2017
Department
Public Works
Department Project Manager
Richard Hefti
Subject / Project Title
Water Main Replacement R UP3646
Public Works WO Number
UP3646
Tracking Number
0000659
Total Compensation
$1,382,407.59
Contract Type
Capital Contract
Retention Period
10 Years Then Transfer to State Archivist
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
332
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
CITY OF EVERETT SPECIAL PROVISIONS <br /> If the Contractor fails to comply with a written order to remedy what the Engineer <br /> determines to be an emergency situation, the Engineer may have the defective and <br /> unauthorized Work corrected immediately, have the rejected Work removed and <br /> replaced, or have Work the Contractor refuses to perform completed by using City or <br /> other forces. An emergency situation is a situation when, in the opinion of the <br /> Engineer, a delay in its remedy could be potentially unsafe, or might cause serious risk <br /> of loss or damage to the public. <br /> Direct or indirect costs incurred by the City attributable to correcting and remedying <br /> defective or unauthorized Work, or Work the Contractor failed or refused to perform, <br /> shall be paid by the Contractor. Payment will be deducted by the Engineer from <br /> monies due, or to become due, the Contractor. Such direct and indirect costs shall <br /> include in particular, but without limitation, compensation for additional professional <br /> services required, and costs for repair and replacement of Work of others destroyed or <br /> damaged by correction, removal, or replacement of the Contractor's unauthorized <br /> Work. <br /> In its sole discretion, the City may retain Work that is not in compliance with the <br /> Contract. The City will determine the just and reasonable value for such defective <br /> Work and deductions will be made in the payments due or to become due to the <br /> Contractor. Final Acceptance will not act as a waiver of the City's right to recover from <br /> the Contractor an amount representing the deduction for retention of defective Work. <br /> No adjustment in Contract Time or Contract Sum will be allowed because of the Delay <br /> in the performance of the Work attributable to the exercise of the City's rights provided <br /> by this section. <br /> The rights exercised under the provisions of this section shall not diminish the City's <br /> right to pursue any other avenue for additional remedy or damages with respect to the <br /> Contractor's failure to perform the Work as required. <br /> 1-05.10 Guarantees <br /> Supplement 1-05.10 by adding the following: <br /> The Contractor further warrants to the City, the Engineer and the City's Representative <br /> that all materials and Equipment furnished under this Contract will be of highest quality <br /> and new unless otherwise specified by the City, free from faults and defects and in <br /> conformance with the Contract Documents. All Work not so conforming to these <br /> standards shall be considered defective. If required by the City's Representative, the <br /> Contractor shall furnish satisfactory evidence as to the kind and quality of materials <br /> and Equipment. <br /> The Work furnished shall be of first quality and the workmanship shall be the best <br /> obtainable in the various trades. The Work shall be of safe, substantial and durable <br /> construction in all respects. For a period of 365 calendar days, commencing on the <br /> date of Final Acceptance, the Contractor shall, upon the receipt of Notice in writing <br /> from the City, promptly make all repairs arising out of defective materials, <br /> workmanship, or Equipment at no cost to the City. The City is hereby authorized to <br /> make such repairs if, fourteen (14) calendar days after giving of such Notice to the <br /> Contractor, the Contractor has failed to make or undertake the repairs with due <br /> diligence. In case of an emergency where, in the opinion of the City, delay could <br /> cause serious loss or damage, repairs may be made prior to or concurrent with Notice <br /> being sent to the Contractor. All expenses in connection with such repairs will be <br /> charged to the Contractor. <br /> "Acceptance of the Work" shall not extinguish any covenant or agreement on the part <br /> of the Contractor to be performed or fulfilled under this Contract that has not, in fact, <br /> Water Main Replacement R Division 1 —GENERAL REQUIREMENTS March 1, 2017 <br /> WO No—UP3646 SP-58 <br />
The URL can be used to link to this page
Your browser does not support the video tag.