Laserfiche WebLink
CITY OF EVERETT SPECIAL PROVISIONS <br /> 8-13.2 Materials 165 <br /> 8-13.3 Construction Requirements 165 <br /> 8-13.4 Measurement 165 <br /> 8-13.5 Payment 165 <br /> 8-14 CEMENT CONCRETE SIDEWALKS 165 <br /> 8-14.2 Materials 165 <br /> 8-14.3 Construction Requirements 165 <br /> 8-14.4 Measurement 165 <br /> 8-14.5 Payment 165 <br /> DIVISION 9 - MATERIALS 177 <br /> 9-03 AGGREGATES 177 <br /> 9-03.6 Vacant 177 <br /> 9-03.6 Aggregates for Asphalt Treated Base (ATB) 177 <br /> 9-03.22 Sand Backfill for Pipe Zone (******) 177 <br /> 9-14 EROSION CONTROL AND ROADSIDE PLANTING 177 <br /> 9-14.1 Soil 177 <br /> 9-14.2 Seed 177 <br /> 9-14.6 Plant Materials 177 <br /> 9-23 CONCRETE CURING MATERIALS AND ADMIXTURES 177 <br /> 9-23.2 Liquid Membrane-Forming Concrete Curing Compounds 177 <br /> 9-23.6 Chemical Admixtures for Concrete 177 <br /> 9-30 WATER DISTRIBUTION MATERIALS 177 <br /> 9-30.1 Pipe 177 <br /> 9-30.2 Fittings 177 <br /> 9-30.3 Valves 177 <br /> 9-30.5 Hydrants 177 <br /> 9-30.6 Water Service Connections (2-inches and Smaller) 177 <br /> APPENDIX A - BORING LOGS 183 <br /> APPENDIX B - COE STANDARD DRAWINGS 193 <br /> APPENDIX C - CHANGE ORDER FORMS 209 <br /> A PPDIX DPv(v_ET SOUND CLEAN AIR AGENCY - EXCERPTS OF Hi R QUALITY <br /> RULES 219 <br /> APPENDIX E - WA PREVAILING WAGE RATES 227 <br /> Watermain Replacement"R" Table of Contents - March 1, 2017 <br /> WO No.—UP3646 SP -vii <br />