Laserfiche WebLink
CITY OF EVERETT SPECIAL PROVISIONS <br /> Contractor shall store materials and Equipment so as to insure the preservation of their <br /> quality and fitness for the Work. Store Equipment and materials at location that <br /> facilitates inspection. The Contractor shall be responsible for damages, loss or <br /> casualty occurring to materials and Equipment until Final Acceptance. <br /> 1-06.6 Recycled Materials <br /> Delete 1-06.6 in its entirety and substitute with the following: <br /> The Contractor shall make their best effort to utilize recycled materials in the <br /> construction of the project. Approval of such material use shall be as detailed <br /> elsewhere in the Standard Specifications. <br /> Prior to Physical Completion the Contractor shall report the quantity of recycled <br /> materials that were utilized in the construction of the project for each of the items listed <br /> in Section 9-03.21. The report shall include hot mix asphalt, recycled concrete <br /> aggregate, recycled glass, steel furnace slag and other recycled materials (e.g. <br /> utilization of on-site material and aggregates from concrete returned to the supplier). <br /> The Contractor's report shall be provided on DOT form 350-075 Recycled Materials <br /> Reporting. <br /> 1-07 LEGAL RELATIONS AND RESPONSIBILITIES TO THE PUBLIC <br /> 1-07.1 Laws to be Observed <br /> Supplement 1-07.1 by adding the following: <br /> The Contractor shall be in compliance with all applicable standards, orders, or <br /> requirements issued under Section 306 of the Clear Air Act [42 U.S.C. 1857(h)], <br /> Section 508 of the Clean Water Act (33 U.S.C. 1368), Executive Order 11738, and <br /> Environmental Protection Agency Regulations (40 CFR Part 15). (Contracts, <br /> subcontracts, and subgrants of amounts in excess of$100,000). <br /> The Contractor shall comply with mandatory standards and policies relating to energy <br /> efficiency that are contained in the state energy conservation plan issued in <br /> compliance with the Energy Policy and Conservation Act (Pub. L. 94-163). <br /> The City advises all general contractors and subcontractors that numerous Federal, <br /> State, and Local regulations exist that could affect the procedures used in the <br /> completion of this project. The City advises each prospective Contractor that they are <br /> responsible to be aware of and comply with ail applicable statutes and regulations. it <br /> is recommended that each Contractor contact the local office of the following agencies <br /> for a list of applicable regulations and requirements that might affect the <br /> implementation of this project: <br /> • Federal Environmental Protection Agency <br /> • Washington Department of Health <br /> • Washington Department of Ecology <br /> • Washington Department of Fisheries <br /> • Washington Department of Wildlife <br /> • Washington Department of Labor & Industries <br /> • Puget Sound Air Pollution Control Agency <br /> • Municipal Building Department <br /> • Municipal Planning Department <br /> • Municipal Public Works Department <br /> If the scope of Work in this Contract includes Work at the City of Everett Water <br /> Filtration Plant or the Waste Water Pollution Control Facility, Contractor shall comply <br /> with the requirements of the Washington Department of Labor & Industries for such <br /> work including, but not limited to, Chapter 296-67 WAC. All costs associated or <br /> Water Main Replacement R Division 1 —GENERAL REQUIREMENTS March 1, 2017 <br /> WO No—UP3646 SP—68 <br />