My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Reece Construction Company Inc. 5/24/2017
>
Contracts
>
Capital Contract
>
Reece Construction Company Inc. 5/24/2017
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/5/2017 10:39:05 AM
Creation date
6/5/2017 10:37:28 AM
Metadata
Fields
Template:
Contracts
Contractor's Name
Reece Construction Company Inc.
Approval Date
5/24/2017
Council Approval Date
5/3/2017
Department
Public Works
Department Project Manager
Richard Hefti
Subject / Project Title
Water Main Replacement R UP3646
Public Works WO Number
UP3646
Tracking Number
0000659
Total Compensation
$1,382,407.59
Contract Type
Capital Contract
Retention Period
10 Years Then Transfer to State Archivist
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
332
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
CITY OF EVERETT SPECIAL PROVISIONS <br /> The City's costs to enforce recovery of these amounts are additive to the amounts <br /> owing. <br /> The Contractor specifically assumes all potential liability for actions brought by <br /> employees of the Contractor and, solely for the purpose of enforcing the defense and <br /> indemnification obligations set forth in 1-07.14, the Contractor specifically waives any <br /> immunity granted under the State industrial insurance law, Title 51 RCW. This waiver <br /> has been mutually negotiated by the parties. The Contractor shall similarly require that <br /> each Subcontractor it retains in connection with the project comply with the terms of <br /> this paragraph, waive any immunity granted under Title 51 RCW, and assume all <br /> liability for actions brought by employees of the Subcontractor. <br /> The indemnity, defense and other obligations in this 1-07.14 are in addition to any <br /> indemnity, defense or other obligation that may be contained elsewhere in the Contract <br /> Documents. <br /> 1-07.17 Utilities and Similar Facilities <br /> Supplement 1-07.17 by adding the following: <br /> The Contractor shall review its responsibilities under Chapter 19.122 RCW, a law <br /> relating to underground utilities. Cost to the Contractor incurred as a result of <br /> complying with this law shall be at the Contractor's expense. In accordance with RCW <br /> 19.122, the Contractor shall call the Utility Coordinating Council One Call Center, 1- <br /> 800-424-5555, for field location, not less than 2 nor more than 10 business days before <br /> the scheduled date for commencement of excavation that may affect underground <br /> utility facilities, unless otherwise agreed upon by the parties involved. A business day <br /> is defined as any day other than Saturday, Sunday, or a legal local, State, or Federal <br /> holiday. <br /> The Contractor shall be responsible for determining the exact location, including <br /> service connections, of all public and private underground utilities marked at the site of <br /> the Work. Perform field verification prior to beginning Work that could result in damage <br /> to buried utilities, including but not limited to exploratory excavations, in sufficient time <br /> so as not to impede the progress of the Work or fabrication of materials to be <br /> incorporated into the Work. The Contractor shall immediately notify the City's <br /> Representative as to any utility discovered by him in a different position than shown on <br /> the Plans or that is not shown on the Plans. <br /> No excavation shall begin until all known underground public and private utilities in the <br /> vicinity of the excavation area have been located and marked. <br /> Utilities of record are shown on the Plans insofar as it is possible to do so. Failure of <br /> the City to show the existence of subsurface objects or installation on the Plans shall <br /> not relieve the Contractor from its responsibility to make an independent check on the <br /> ground, nor relieve Contractor from all liability for damages resulting from its <br /> operations. <br /> It shall be entirely the responsibility of the Contractor to give proper notification to the <br /> agencies that have utilities in place and to coordinate with these agencies in the <br /> protection and relocation of the various underground installations. These agencies will <br /> give assistance in the location of the various utilities, but this shall not relieve the <br /> Contractor from responsibility for any damage incurred. The City shall require a <br /> notification of at least five working days. The Contractor shall hold the City harmless <br /> against any claim of any nature resulting from Delays in attending to same. <br /> Following are addresses and telephone numbers of utilities in the Everett area for the <br /> Contractor's convenience: <br /> Water Main Replacement R Division 1 —GENERAL REQUIREMENTS March 1, 2017 <br /> WO No—UP3646 SP—75 <br />
The URL can be used to link to this page
Your browser does not support the video tag.