Laserfiche WebLink
CITY OF EVERETT SPECIAL PROVISIONS <br /> 5. To review safety standards and traffic control; and <br /> 6. To discuss such other related items as may be pertinent to the Work. <br /> The Contractor shall prepare and submit at the preconstruction meeting the following: <br /> 1. A Schedule of Values of all lump sum items; <br /> 2. A preliminary schedule of working drawing submittals; and <br /> 3. A list of material sources for approval if applicable. <br /> 1-08.0(2) Hours of Work <br /> Except in the case of emergency or unless otherwise approved by the City, the normal <br /> working hours for the Contract shall be between 7:00 a.m. and 6:00 p.m., Monday <br /> through Friday. Should Contractror elect to work on a holiday or weekend, those <br /> normal working hours shall be from 8:00 a.m. to 6:00 p.m. <br /> If a Contractor desires to perform Work on holidays, Saturdays, or Sundays, or after <br /> 6:00 p.m. and before 10:00 p.m. on any weekday, the Contractor shall apply in writing <br /> to the Engineer for permission. Such requests shall be submitted to the Engineer no <br /> later than noon on the working day prior to the day for which the Contractor is <br /> requesting permission to work. <br /> Permission to work within 500 feet of residential properties between the hours of 10:00 <br /> p.m. and 7:00 a.m. during weekdays and between the hours of 6:00 p.m. and 8:00 <br /> a.m. on weekends or holidays will require a noise variance that will be subject to noise <br /> control requirements. Approval to continue Work during these hours may be revoked <br /> at any time the Contractor exceeds the City's noise control regulations or complaints <br /> are received from the public or adjoining property owners regarding the noise from the <br /> Contractor's operations. The Contractor shall have no claim for damages or delays <br /> should such permission be revoked for these reasons. <br /> Permission to work Saturdays, Sundays, holidays or other than the agreed upon <br /> normal working hours Monday through Friday may be given subject to certain other <br /> conditions set forth by the City or Engineer. These conditions may include and are not <br /> limited to: requiring the Engineer or such assistants as the Engineer may deem <br /> necessary to be present during the Work; considering the work performed on <br /> Saturdays, Sundays, and holidays as working days with regards to the Contract Time; <br /> and considering multiple work shifts as multiple working days with respect to Contract <br /> Time even though the multiple shifts occur in a single 24-hour period. Assistants may <br /> include, but are not limited to, survey crews; personnel from the City's material testing <br /> lab; inspectors; and other City employees when in the opinion of the Engineer, such <br /> work necessitates their presence. <br /> 1-08.1 Subcontracting <br /> Delete the eighth paragraph in 1-08.1 and substitute the following: <br /> On all projects funded with City funds only, the Contractor shall certify to the actual <br /> amounts paid Disadvantaged, Minority, or Women's Business Enterprise firms that <br /> were used as subcontractors, lower tier subcontractors, manufacturers, regular <br /> dealers; or service providers on the Contract. This certification shall be submitted to <br /> the Engineer on WSDOT form 140-542 within 20-calendar days after physical <br /> completion of the Contract. <br /> Supplement 1-08.1 by adding the following: <br /> The Contract Documents shall apply to Subcontractors and suppliers as if each had <br /> signed the Contract with the City. Contractor shall include the provisions of these <br /> Contract Documents or a "flow down" clause in each contract with Subcontractors and <br /> suppliers. <br /> Water Main Replacement R Division 1 -GENERAL REQUIREMENTS March 1, 2017 <br /> WO No-UP3646 SP -84 <br />