My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Granite Construction Company 5/24/2017
>
Contracts
>
Capital Contract
>
Granite Construction Company 5/24/2017
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
12/6/2017 10:26:42 AM
Creation date
6/5/2017 11:29:42 AM
Metadata
Fields
Template:
Contracts
Contractor's Name
Granite Construction Company
Approval Date
5/24/2017
Council Approval Date
5/10/2017
Department
Public Works
Department Project Manager
Narci Ricafrente
Subject / Project Title
Hot Mix Asphalt Overlay 2017 Project
Public Works WO Number
PW3642
Tracking Number
0000660
Total Compensation
$3,938,398.65
Contract Type
Capital Contract
Retention Period
10 Years Then Transfer to State Archivist
Document Relationships
Granite Construction Company 9/29/2017 Amendment 1
(Contract)
Path:
\Documents\City Clerk\Contracts\Capital Contract
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
214
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
I <br /> PI <br /> IC=MO14 I 4, <br /> I <br /> t _SLOT-SEE DETAILin <br /> .,��,. LI <br /> To <br /> 17 IA II <br /> ., <br /> O-- I .. u i , ' i 1 ! 1 i I <br /> 11j In <br /> - o <br /> I L- I [ L C I � I N <br /> Mr <br /> } . a L a ii "'J �//� <br /> r1 i T <br /> Z I <br /> r0 0 :i [: ' <br /> L I Li U 1-- <br /> i <br /> FLOW I '//(/�/� <br /> II <br /> • <br /> Im <br /> m <br /> 0 <br /> 24" <br /> Il I's::: l <br /> 7 OR 8 EQUAL SPACES • <br /> now-o <br /> . . <br /> u , DIRECTION OF FLOW <br /> u) -—ri. _.jr / /zl_4(_=/ . /_,„_____A . <br /> trn <br /> I cl o r • <br /> ,„ <br /> i it <br /> o r <br /> Ii 1. WHEN BOLT-DOWN GRATES ARE SPECIFIED, PROVIDE TWO <br /> SLOTS IN THE GRATE THAT ARE VERTICALLY ALIGNED WITH THE , <br /> o HOLES IN THE FRAME. LOCATION OF BOLT-DOWN SLOTS VARIES <br /> AMONG DIFFERENT MANUFACTURERS. <br /> I W 2. REFER TO COE DESIGN AND CONSTRUCTION STANDARDS <br /> SPECIFICATIONS SECTION 4 FOR ADDITIONAL REQUIREMENTS. SEE NOTE 1 <br /> 3. FOR FRAME DETAILS, SEE COE STANDARD DWG 405. <br /> oI4 <br /> Q • <br /> .1 <br /> 0 <br /> WSDOT STD PLAN B-30.30 <br /> I <br /> �__m_� .__ _ ACCEPTABLE SUBSTITUTE -.____ <br /> 0 <br /> 61 çPVAS ® RA I ®R 12-d3- 010 <br /> CITY VE ' Date: i U L C w. CATCH BASIN ORf 406C <br /> • R ' <br /> v i .,jE/ER�Fi DEPARTMENT 9 N L� I OE Std gDwo:; <br /> a <br />
The URL can be used to link to this page
Your browser does not support the video tag.