My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Granite Construction Company 5/24/2017
>
Contracts
>
Capital Contract
>
Granite Construction Company 5/24/2017
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
12/6/2017 10:26:42 AM
Creation date
6/5/2017 11:29:42 AM
Metadata
Fields
Template:
Contracts
Contractor's Name
Granite Construction Company
Approval Date
5/24/2017
Council Approval Date
5/10/2017
Department
Public Works
Department Project Manager
Narci Ricafrente
Subject / Project Title
Hot Mix Asphalt Overlay 2017 Project
Public Works WO Number
PW3642
Tracking Number
0000660
Total Compensation
$3,938,398.65
Contract Type
Capital Contract
Retention Period
10 Years Then Transfer to State Archivist
Document Relationships
Granite Construction Company 9/29/2017 Amendment 1
(Contract)
Path:
\Documents\City Clerk\Contracts\Capital Contract
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
214
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
1 1-07.9.GR1 <br /> 2 Wages <br /> 3 <br /> 4 1-07.9(1).GR1 <br /> 5 General <br /> 6 <br /> 7 1-07.9(1),INSTI.GR1 <br /> 8 Section 1-07.9(1) is supplemented with the following: <br /> 9 <br /> 10 1-07.9(1).OPTI.GR1 <br /> 11 (January 8, 2016) <br /> 12 The Federal wage rates incorporated in this contract have been <br /> 13 established by the Secretary of Labor under United States Department of <br /> 14 Labor General Decision No. WA160001. <br /> 15 <br /> 16 The State rates incorporated in this contract are applicable to all <br /> 17 construction activities associated with this contract. <br /> 18 <br /> 19 <br /> 20 <br /> 21 1-07.13.GR1 <br /> 22 Contractor's Responsibility for Work <br /> 23 <br /> 24 1-07.13(4).GR1 <br /> 25 Repair of Damage <br /> 26 <br /> 27 1-07.13(4).1 NST1.G R1 <br /> 28 Section 1-07.13(4) is revised to read: <br /> 29 <br /> 30 1-07.13(4).OPTI.GR1 <br /> 31 (August 6, 2001) <br /> 32 The Contractor shall promptly repair all damage to either temporary or <br /> 33 permanent work as directed by the Engineer. For damage qualifying for <br /> 34 relief under Sections 1-07.13(1), 1-07.13(2) or 1-07.13(3), payment will be <br /> 35 made in accordance with Section 1-04.4. Payment will be limited to repair <br /> 36 of damaged work only. No payment will be made for delay or disruption of <br /> 37 work. <br /> 38 <br /> 39 COE 1-07.17 UTILITIES.RTF <br /> 40 <br /> 41 Locations and dimensions shown in the Plans for existing facilities are in <br /> 42 accordance with available information obtained without uncovering, measuring, <br /> 43 or other verification. <br /> 44 <br /> 45 The following addresses and telephone numbers of utility companies known or <br /> 46 suspected of having facilities within the project limits are supplied for the <br /> 47 Contractor's convenience: <br /> HOT MIX ASPHALT OVERLAY 2017 MARCH 2017 <br /> 19 <br />
The URL can be used to link to this page
Your browser does not support the video tag.