My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Granite Construction Company 5/24/2017
>
Contracts
>
Capital Contract
>
Granite Construction Company 5/24/2017
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
12/6/2017 10:26:42 AM
Creation date
6/5/2017 11:29:42 AM
Metadata
Fields
Template:
Contracts
Contractor's Name
Granite Construction Company
Approval Date
5/24/2017
Council Approval Date
5/10/2017
Department
Public Works
Department Project Manager
Narci Ricafrente
Subject / Project Title
Hot Mix Asphalt Overlay 2017 Project
Public Works WO Number
PW3642
Tracking Number
0000660
Total Compensation
$3,938,398.65
Contract Type
Capital Contract
Retention Period
10 Years Then Transfer to State Archivist
Document Relationships
Granite Construction Company 9/29/2017 Amendment 1
(Contract)
Path:
\Documents\City Clerk\Contracts\Capital Contract
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
214
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
I <br /> I1 not occur between the hours of 6:00am to 6:00pm. <br /> 2 Lane closures for casting adjustments will not be <br /> I 3 permitted 2:00pm to 6:00pm and 9:00pm to 7:00am. <br /> 4 <br /> 5 Lowell-Snohomish No roadway closures, detours, or lane closures will be <br /> I 6 River Rd permitted between 5:00am and 7:00pm, except for <br /> 7 casting adjustments. Lane closures for plastic <br /> 8 pavement marking work shall not occur between the <br /> I <br /> 9 hours of 5:00am to 6:00pm. Lane closures for casting <br /> 10 adjustments will not be permitted 8:00pm to 7:00am. <br /> 11 <br /> 12 Hewitt Ave No lane closures will be permitted between 5:00am <br /> 1 13 and 7:00pm, except for casting adjustments. Lane <br /> 14 closures for plastic pavement marking work shall not <br /> 15 occur between the hours of 5:00am to 7:00pm. Lane <br /> I <br /> 16 <br /> 17 closures for casting adjustments will not be permitted <br /> 2:00pm to 6:00pm and 9:00pm to 7:00am. <br /> 18 <br /> I 19 <br /> 20 Alleys No Restrictions, except that lane closures for casting <br /> adjustments will not be permitted 9:00pm to 7:00am. <br /> 21 <br /> I <br /> 22 <br /> 23 Kasch Park Rd No lane closures will be permitted between 5:00am <br /> and 7:00pm, except for casting adjustments. Lane <br /> 24 closures for plastic pavement marking work shall not <br /> I 25 occur between the hours of 5:00am to 6:00pm. Lane <br /> 26 closures for casting adjustments will not be permitted <br /> 27 8:00pm to 7:00am. <br /> 28 <br /> 1 29 The Contractor shall provide uniformed Police control at any time an <br /> 30 intersection is dark or inoperative, such as during grinding or paving <br /> 31 operations where the signal must be put into flashing operation. Signalized <br /> I 32 intersections shall not be police controlled between the hours of 6:00am and <br /> 33 8:30am nor 12:00pm to 7:30pm, unless directed by the Engineer. <br /> 34 <br /> I 35 Coordination of uniformed Police control shall be coordinated with the <br /> 36 following personnel, listed in order of preference: <br /> 37 <br /> I <br /> 38 <br /> 39 1. City of Everett Police Officers Association <br /> Post Office Box 1253 <br /> 40 Everett, WA 98201 <br /> 41 Contacts: <br /> 42 Officer Mike Bernardi (425) 327-9119 <br /> 43 Officer Jack Jessup (425) 345-9935 <br /> 44 <br /> 1 <br /> 45 2. Puget Sound Executive Services <br /> 46 625 B 5th Avenue, Suite 4 <br /> 47 Sequim, WA 98382 <br /> I <br /> 48 Contact: <br /> 49 Nick Janssen (360) 681-7737 <br /> I <br /> HOT MIX ASPHALT OVERLAY 2017 MARCH 2017 <br /> 1 28 <br />
The URL can be used to link to this page
Your browser does not support the video tag.