My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Granite Construction Company 5/24/2017
>
Contracts
>
Capital Contract
>
Granite Construction Company 5/24/2017
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
12/6/2017 10:26:42 AM
Creation date
6/5/2017 11:29:42 AM
Metadata
Fields
Template:
Contracts
Contractor's Name
Granite Construction Company
Approval Date
5/24/2017
Council Approval Date
5/10/2017
Department
Public Works
Department Project Manager
Narci Ricafrente
Subject / Project Title
Hot Mix Asphalt Overlay 2017 Project
Public Works WO Number
PW3642
Tracking Number
0000660
Total Compensation
$3,938,398.65
Contract Type
Capital Contract
Retention Period
10 Years Then Transfer to State Archivist
Document Relationships
Granite Construction Company 9/29/2017 Amendment 1
(Contract)
Path:
\Documents\City Clerk\Contracts\Capital Contract
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
214
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
I <br /> 1 1 <br /> 2 At the time of returning signals to normal operation, a city of Everett traffic <br /> I 3 signal technician will need to be on standby since most signals will not return <br /> 4 to normal operation with a turn of the police panel switch and require a <br /> 5 conflict monitor reset. <br /> I 6 <br /> 7 Coordination of traffic signal technician shall be coordinated with the <br /> 8 following personnel: <br /> I 9 <br /> 10 2. City of Everett Public Works <br /> 11 3200 Cedar Street <br /> 12 Everett, WA 98201 <br /> I <br /> 13 Contact: <br /> 14 Steve Sawyer (425) 328-0643 <br /> 15 <br /> I 16 <br /> 17 <br /> 18 If the Engineer determines the permitted closure hours adversely affect <br /> I 19 traffic, the Engineer may adjust the hours accordingly. The Engineer will <br /> 20 notify the Contractor in writing of any change in the closure hours. <br /> 21 <br /> I 22 Lane closures are not allowed on any of the following: <br /> 23 <br /> 24 1. A holiday, <br /> I 25 <br /> 26 2. A holiday weekend; holidays that occur on Friday, Saturday, <br /> 27 Sunday or Monday are considered a holiday weekend. A holiday <br /> 28 weekend includes Saturday, Sunday, and the holiday. <br /> 1 29 <br /> 30 3. After*** 2:30 P.M. **'t on the day prior to a holiday or holiday <br /> 31 weekend, and <br /> I 32 <br /> 33 4. Before *** 7:00 A.M. *** on the day after the holiday or holiday <br /> 34 weekend. <br /> I 35 <br /> 36 <br /> 37 1-07.24.RTF <br /> I 38 1-07.24 Rights of Way <br /> 39 (July 23, 2015 APWA GSP) <br /> 40 Delete this section and replace it with the following: <br /> I 41 <br /> 42 Street Right of Way lines, limits of easements, and limits of construction permits <br /> 43 are indicated in the Plans. The Contractor's construction activities shall be <br /> I 44 confined within these limits, unless arrangements for use of private property are <br /> 45 made. <br /> 46 <br /> 47 Generally, the Contracting Agency will have obtained, prior to bid opening, all <br /> I48 rights of way and easements, both permanent and temporary, necessary for <br /> I <br /> HOT MIX ASPHALT OVERLAY 2017 MARCH 2017 <br /> 1 29 <br />
The URL can be used to link to this page
Your browser does not support the video tag.