My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Granite Construction Company 5/24/2017
>
Contracts
>
Capital Contract
>
Granite Construction Company 5/24/2017
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
12/6/2017 10:26:42 AM
Creation date
6/5/2017 11:29:42 AM
Metadata
Fields
Template:
Contracts
Contractor's Name
Granite Construction Company
Approval Date
5/24/2017
Council Approval Date
5/10/2017
Department
Public Works
Department Project Manager
Narci Ricafrente
Subject / Project Title
Hot Mix Asphalt Overlay 2017 Project
Public Works WO Number
PW3642
Tracking Number
0000660
Total Compensation
$3,938,398.65
Contract Type
Capital Contract
Retention Period
10 Years Then Transfer to State Archivist
Document Relationships
Granite Construction Company 9/29/2017 Amendment 1
(Contract)
Path:
\Documents\City Clerk\Contracts\Capital Contract
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
214
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
I <br /> 1 1 <br /> 2 <br /> 3 <br /> 4 <br /> 5 1-08.4.RTF <br /> 1 6 1-08.4 Prosecution of Work <br /> 7 <br /> 8 Delete this section in its entirety, and replace it with the following: <br /> I9 <br /> 10 1-08.4 Notice to Proceed and Prosecution of Work <br /> 11 (July 23, 2015 APWA GSP) <br /> I 12 Notice to Proceed will be given after the contract has been executed and the <br /> 13 contract bond and evidence of insurance have been approved and filed by the <br /> 14 Contracting Agency. The Contractor shall not commence with the work until the <br /> I <br /> 15 <br /> 16 Notice to Proceed has been given by the Engineer. The Contractor shall <br /> commence construction activities on the project site within ten days of the Notice <br /> 17 to Proceed Date, unless otherwise approved in writing. The Contractor shall <br /> 18 diligently pursue the work to the physical completion date within the time <br /> 19 specified in the contract. Voluntary shutdown or slowing of operations by the <br /> 20 Contractor shall not relieve the Contractor of the responsibility to complete the <br /> I <br /> 21 work within the time(s) specified in the contract. <br /> 22 <br /> 23 When shown in the Plans, the first order of work shall be the installation of high <br /> 24 visibility fencing to delineate all areas for protection or restoration, as described <br /> I25 in the Contract. Installation of high visibility fencing adjacent to the roadway shall <br /> 26 occur after the placement of all necessary signs and traffic control devices in <br /> 27 accordance with 1-10.1(2). Upon construction of the fencing, the Contractor <br /> I 28 shall request the Engineer to inspect the fence. No other work shall be <br /> 29 performed on the site until the Contracting Agency has accepted the installation <br /> 30 of high visibility fencing, as described in the Contract. <br /> I 31 <br /> 32 <br /> 33 1-08.5 Option A.RTF <br /> I 34 1-08.5 Time for Completion <br /> 35 (September 12, 2016 APWA GSP, Option A) <br /> 36 <br /> I 37 Revise the third and fourth paragraphs to read: <br /> 38 <br /> 39 Contract time shall begin on the first working day following the Notice to Proceed <br /> 1 40 Date. <br /> 41 <br /> 42 Each working day shall be charged to the contract as it occurs, until the contract <br /> 43 work is physically complete. If substantial completion has been granted and all <br /> I <br /> 44 the authorized working days have been used, charging of working days will <br /> 45 cease. Each week the Engineer will provide the Contractor a statement that <br /> 46 shows the number of working days: (1) charged to the contract the week before; <br /> I 47 (2) specified for the physical completion of the contract; and (3) remaining for <br /> 48 the physical completion of the contract. The statement will also show the <br /> I <br /> HOT MIX ASPHALT OVERLAY 2017 MARCH 2017 <br /> I 34 <br />