My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Granite Construction Company 5/24/2017
>
Contracts
>
Capital Contract
>
Granite Construction Company 5/24/2017
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
12/6/2017 10:26:42 AM
Creation date
6/5/2017 11:29:42 AM
Metadata
Fields
Template:
Contracts
Contractor's Name
Granite Construction Company
Approval Date
5/24/2017
Council Approval Date
5/10/2017
Department
Public Works
Department Project Manager
Narci Ricafrente
Subject / Project Title
Hot Mix Asphalt Overlay 2017 Project
Public Works WO Number
PW3642
Tracking Number
0000660
Total Compensation
$3,938,398.65
Contract Type
Capital Contract
Retention Period
10 Years Then Transfer to State Archivist
Document Relationships
Granite Construction Company 9/29/2017 Amendment 1
(Contract)
Path:
\Documents\City Clerk\Contracts\Capital Contract
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
214
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
I <br /> CITY OF EVERETT, WASHINGTON <br /> 111 SPECIAL PROVISIONS <br /> DIVISION 2 <br /> EARTHWORK <br /> 2-02 REMOVAL OF STRUCTURES AND OBSTRUCTIONS <br /> Section 2-02.3(3) is supplemented with the following: <br /> 2-02.4 Measurement <br /> Section 2-02.4 is supplemented with the following: <br /> Sidewalk removal will be measured by the square yard. The unit contract price shall be full pay as <br /> described in this Section for removing sidewalk where shown in the Plans, including sawcutting up to <br /> 6" in depth, removal of concrete panels entirely, restoration of native vegetation disturbed by the <br /> operation, and all other Work necessary for the removal of sidewalk panels and disposal of materials <br /> from the site. <br /> 2-02.5 Payment <br /> Section 2-02.5 is revised by the following: <br /> r "Removing Sidewalk", per square yard. <br /> SECTION 2-04 <br /> HAUL <br /> SECTION 2-04 OF THE STANDARD SPECIFICATIONS IS DELETED AND REPLACED WITH <br /> THE FOLLOWING: <br /> 1 2-04.1 Description <br /> This work shall consist of transporting excavated material from its original site to its final resting place on <br /> the project or at a waste site. <br /> 2-04.3 Construction Requirements <br /> Off-highway earth-moving equipment shall not haul on or across any street not being improved in the <br /> Contract. <br /> 2-04.4 Measurement <br /> Haul work will not be measured. <br /> 2-04.5 Payment <br /> All costs for the work described in Section 2-04 will be considered incidental to excavation. All costs for <br /> haul shall be included in the costs associated with the excavation. <br /> HOT MIX ASPHALT OVERLAY 2017 PAGE 1 OF 2 MARCH 2017 <br /> WORK ORDER# PW 3642 <br /> 1 DIVISION 2 <br />
The URL can be used to link to this page
Your browser does not support the video tag.