My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Granite Construction Company 5/24/2017
>
Contracts
>
Capital Contract
>
Granite Construction Company 5/24/2017
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
12/6/2017 10:26:42 AM
Creation date
6/5/2017 11:29:42 AM
Metadata
Fields
Template:
Contracts
Contractor's Name
Granite Construction Company
Approval Date
5/24/2017
Council Approval Date
5/10/2017
Department
Public Works
Department Project Manager
Narci Ricafrente
Subject / Project Title
Hot Mix Asphalt Overlay 2017 Project
Public Works WO Number
PW3642
Tracking Number
0000660
Total Compensation
$3,938,398.65
Contract Type
Capital Contract
Retention Period
10 Years Then Transfer to State Archivist
Document Relationships
Granite Construction Company 9/29/2017 Amendment 1
(Contract)
Path:
\Documents\City Clerk\Contracts\Capital Contract
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
214
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
I <br /> I <br /> SECTION 2-07.8 (New Section) <br /> STREET CLEANING <br /> 2-07.8(1) Description <br /> This work shall consist of sweeping all construction related roads, and clearing the pavement and <br /> removing debris from the roadway <br /> 2-07.8(2) Construction Requirements <br /> The use of water to perform street sweeping work shall be held to a minimum unless designated otherwise <br /> by the Engineer. The Contractor shall provide self-propelled pickup sweepers and/or vacuum pick up <br /> sweepers for pavement cleaning and debris removal whenever their use is ordered by the Engineer. The <br /> type and number of sweepers are subject to the approval of the Engineer. <br /> Daily sweeping shall continue on all construction related roads at least once per day until said surface is <br /> covered with new HMA. In the event the Contractor sweeper will not be able to work daily on ground <br /> surfaces, the City Forces will provide services, and the Contractor will be billed for each hour of operation. <br /> Sweepers following the grinding work will not be paid by "Street Cleaning". It is incidental to bid item <br /> ' "Planing Bituminous Pavement" (2" deep),per square yard. <br /> The Contractor shall plan the operation to minimize the need for street cleaning. <br /> Debris left in the road or on the side of the road from Planing Bituminous Pavement, will not be paid by <br /> bid item "Street Cleaning". <br /> It is incidental to bid item"Planing Bituminous Pavement" (2" deep),per square yard. <br /> 1 2-07.8(3) Measurement <br /> Street cleaning will be measured by the hour for the actual time consumed in sweeping, pavement <br /> cleaning, and debris removal. No allowance will be made for time consumed in making repairs to the <br /> equipment or for moving the equipment to or from the site on which the street cleaning is ordered. No <br /> separate payment will be made for water required for the normal operation of the pickup sweepers. <br /> 1 2-07.8(4) Payment <br /> Payment will be made in accordance with Section 1-04.1 for the following bid item: <br /> 1. "Street Cleaning", per hour. <br /> I <br /> I <br /> I <br /> HOT MIX ASPHALT OVERLAY 2017 PAGE 2 OF 2 MARCH 2017 <br /> WORK ORDER# PW 3642 <br /> DIVISION 2 <br />
The URL can be used to link to this page
Your browser does not support the video tag.