My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Granite Construction Company 5/24/2017
>
Contracts
>
Capital Contract
>
Granite Construction Company 5/24/2017
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
12/6/2017 10:26:42 AM
Creation date
6/5/2017 11:29:42 AM
Metadata
Fields
Template:
Contracts
Contractor's Name
Granite Construction Company
Approval Date
5/24/2017
Council Approval Date
5/10/2017
Department
Public Works
Department Project Manager
Narci Ricafrente
Subject / Project Title
Hot Mix Asphalt Overlay 2017 Project
Public Works WO Number
PW3642
Tracking Number
0000660
Total Compensation
$3,938,398.65
Contract Type
Capital Contract
Retention Period
10 Years Then Transfer to State Archivist
Document Relationships
Granite Construction Company 9/29/2017 Amendment 1
(Contract)
Path:
\Documents\City Clerk\Contracts\Capital Contract
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
214
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
5-04.4 Measurement <br /> Planing Bituminous Pavement (2" deep) will be measured by the square yard. <br /> "HMA Cl. 1/2", PG 64-22", will be measured by the ton. <br /> SECTION 5-04.5 OF THE STANDARD SPECIFICATIONS IS DELETED AND REPLACED <br /> BY THE FOLLOWING: <br /> 5-04.5 Payment <br /> Payment will be made in accordance with Section 1-04.1, for each of the following bid items that are <br /> included in the proposal: <br /> "HMA Cl. 1/2" PG 64-22",per ton. <br /> The unit contract price per ton for "HMA Cl. 1/2", PG 64-22", " shall be full compensation for all costs <br /> incurred to carry out the requirements of Section 5-04 except for those costs included in other items <br /> which are included in this sub-section and which are included in the proposal. <br /> HMA for Preleveling, if required by the Engineer, will be paid for under bid item, "HMA Cl. 1/2 Inch <br /> PG 64-22", per Ton. <br /> All costs for "Asphalt Tack Coat", "Anti Stripping Additive", and "Compaction Adjustment" shall be <br /> included in the unit contract price per ton of the HMA. <br /> "Planing Bituminous Pavement( 2" deep)", per square yard. <br /> The Unit contract price for square yard for "Planing Bituminous Pavement ( 2" deep)" shall be full <br /> payment for all costs incurred to perform the work described in Section 5-04.3(14.) <br /> I <br /> I <br /> I <br /> I <br /> r <br /> HOT MIX ASPHALT OVERLAY 2017 PAGE 3 OF 3 MARCH 2017 <br /> WORK ORDER# PW 3642 <br /> IDIVISION 5 <br />
The URL can be used to link to this page
Your browser does not support the video tag.