Laserfiche WebLink
5-04.4 Measurement <br /> Planing Bituminous Pavement (2" deep) will be measured by the square yard. <br /> "HMA Cl. 1/2", PG 64-22", will be measured by the ton. <br /> SECTION 5-04.5 OF THE STANDARD SPECIFICATIONS IS DELETED AND REPLACED <br /> BY THE FOLLOWING: <br /> 5-04.5 Payment <br /> Payment will be made in accordance with Section 1-04.1, for each of the following bid items that are <br /> included in the proposal: <br /> "HMA Cl. 1/2" PG 64-22",per ton. <br /> The unit contract price per ton for "HMA Cl. 1/2", PG 64-22", " shall be full compensation for all costs <br /> incurred to carry out the requirements of Section 5-04 except for those costs included in other items <br /> which are included in this sub-section and which are included in the proposal. <br /> HMA for Preleveling, if required by the Engineer, will be paid for under bid item, "HMA Cl. 1/2 Inch <br /> PG 64-22", per Ton. <br /> All costs for "Asphalt Tack Coat", "Anti Stripping Additive", and "Compaction Adjustment" shall be <br /> included in the unit contract price per ton of the HMA. <br /> "Planing Bituminous Pavement( 2" deep)", per square yard. <br /> The Unit contract price for square yard for "Planing Bituminous Pavement ( 2" deep)" shall be full <br /> payment for all costs incurred to perform the work described in Section 5-04.3(14.) <br /> I <br /> I <br /> I <br /> I <br /> r <br /> HOT MIX ASPHALT OVERLAY 2017 PAGE 3 OF 3 MARCH 2017 <br /> WORK ORDER# PW 3642 <br /> IDIVISION 5 <br />