My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Granite Construction Company 5/24/2017
>
Contracts
>
Capital Contract
>
Granite Construction Company 5/24/2017
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
12/6/2017 10:26:42 AM
Creation date
6/5/2017 11:29:42 AM
Metadata
Fields
Template:
Contracts
Contractor's Name
Granite Construction Company
Approval Date
5/24/2017
Council Approval Date
5/10/2017
Department
Public Works
Department Project Manager
Narci Ricafrente
Subject / Project Title
Hot Mix Asphalt Overlay 2017 Project
Public Works WO Number
PW3642
Tracking Number
0000660
Total Compensation
$3,938,398.65
Contract Type
Capital Contract
Retention Period
10 Years Then Transfer to State Archivist
Document Relationships
Granite Construction Company 9/29/2017 Amendment 1
(Contract)
Path:
\Documents\City Clerk\Contracts\Capital Contract
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
214
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
1 <br /> Manholes that need ring and lid replacement shall be identified by the City of Everett Sewer <br /> Department. Replacement ring and lid will be supplied by the City of Everett Sewer Department <br /> 1 and old ring and lid picked up. <br /> Immediately after grinding, Contractor shall construct an asphalt transition around manholes, <br /> catch basins, inlets and other structures. <br /> Adjusting Valve Boxes to Grade <br /> Where shown in the plans, existing valve boxes and covers shall be adjusted to the grade as <br /> staked or otherwise designated by the Engineer. The adjustment of the valve box to grade by the <br /> use of riser rings is not allowed. <br /> Removal operations shall be conducted to prevent damage to the valve boxes. Any parts or <br /> materials damaged due to the Contractors's operations shall be replaced at his expense. <br /> The Contractor shall conduct his valve box adjustments so that the fully- adjusted box allows the <br /> respective valve to be fully operational. The Contractor shall remove all debris from the adjusted <br /> valve boxes to ensure such operational condition. <br /> SECTION 7-5.4 OF THE STANDARD SPECIFICATIONS IS SUPPLEMENTED BY <br /> THE FOLLOWING: <br /> ' 7-5.4 Measurement <br /> "Adjust Valve Box to Grade", shall be measured per each. <br /> SECTION 7-05.5 OF THE STANDARD SPECIFICATIONS IS DELETED AND <br /> REPLACED BY THE FOLLOWING: <br /> 7-05.5 Payment <br /> Payment will be made for each of the following bid items that are included in the proposal: <br /> 1. "Adjust Manhole to Grade", per each. <br /> 2. "Adjust Catch Basin/Inlet to Grade", peer each. <br /> 111 <br /> The payment for"Adjust Manhole to Grade", "Adjust Catch Basin/Inlet to Grade", shall be full <br /> compensation for all costs necessary to make the adjustment including temporary cover, to <br /> lower, raise or adjust existing structure to required elevation, construction of asphalt transition <br /> around the structure, and restoration on adjacent area. Adjustment of any structures twice will be <br /> paid as one adjustment. <br /> 3. "Adjust Valve Box to Grade" <br /> The unit contract price per each for"Adjust Valve Box to Grade" shall be full pay for all costs <br /> necessary to make the adjustment including excavation (approximately 2' square ), haul off, <br /> compaction during restoration with crushed rock and a min of 6" of HMA of the adjacent areas. <br /> The re use of the lower and or upper valve box will be allowed if the upper section can be pulled <br /> up into the proper elevation otherwise the City will provide or pay for the City approved parts. <br /> HOT MIX ASPHALT OVERLAY 2017 PAGE 2 OF 2 MARCH 2017 <br /> WORK ORDER# PW 3642 <br /> DIVISION 7 <br /> I <br />
The URL can be used to link to this page
Your browser does not support the video tag.