My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Granite Construction Company 5/24/2017
>
Contracts
>
Capital Contract
>
Granite Construction Company 5/24/2017
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
12/6/2017 10:26:42 AM
Creation date
6/5/2017 11:29:42 AM
Metadata
Fields
Template:
Contracts
Contractor's Name
Granite Construction Company
Approval Date
5/24/2017
Council Approval Date
5/10/2017
Department
Public Works
Department Project Manager
Narci Ricafrente
Subject / Project Title
Hot Mix Asphalt Overlay 2017 Project
Public Works WO Number
PW3642
Tracking Number
0000660
Total Compensation
$3,938,398.65
Contract Type
Capital Contract
Retention Period
10 Years Then Transfer to State Archivist
Document Relationships
Granite Construction Company 9/29/2017 Amendment 1
(Contract)
Path:
\Documents\City Clerk\Contracts\Capital Contract
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
214
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
The unit contract price shall include saw cutting, cleaning and drying of <br /> pavement, installing loops and home runs, loop lead-in conduits, loop wire, <br /> ' sealant, splice kit and splicing between loop wire and lead-on cable, any work <br /> necessary to access a junction box and testing of the vehicle detectors as <br /> defined in Section 8-20.3(14)D. <br /> ' "Loop Detector Lead-In Cable", per linear foot. <br /> The unit contract price shall be full pay for furnishing and installing each loop <br /> detector lead-In cable in existing conduits between the traffic signal control <br /> cabinet and loop splice point, including all and all other Work necessary <br /> terminate loop lead in cable at either end. <br /> ' "Conduit Pipe 2 In. Diam.", per linear foot. <br /> The unit contract price shall be full pay as described in this Section for furnishing <br /> and installing each conduit stub-out where shown in the Plans, including <br /> ' furnishing all conduit, elbows, bends, and fittings for placing the pipe in <br /> accordance with the above provisions, including all excavation or jacking <br /> required, backfilling of any voids around stub out, pits, or trenches; bedding of <br /> ' the pipe, chipping of pavement, and all other Work necessary for the construction <br /> of the conduit stub-out. <br /> SECTION 8-22 <br /> PAVEMENT MARKINGS <br /> 8-22.2 Materials <br /> Section 8-22.2 is supplemented with the following: <br /> 8-22.3 Construction Requirements <br /> ' Section 8-22.3 is supplemented with the following: <br /> Pavement markings shall be installed in accordance with Section 8-22.3 of the Standard <br /> Specifications with the following modifications: <br /> 1) All Stop Line shall be 24" wide Type D plastic flat line. <br /> 111 <br /> 2) All Crosswalk Line shall be solid white lines, 24" wide, installed in accordance with <br /> City of Everett Standard Drawing No. 721 and shall be Type D plastic flat line. <br /> Where additional 12" lines are required at designated school areas per City of <br /> ' Everett Standard Drawing No. 721, they shall be white 12" Type D plastic flat line. <br /> 3) All two-way left turn yellow lines and lane lines dividing two opposing directions of <br /> travel shall be Type D plastic flat line. <br /> 4) Profiled plastic Type D material shall be used for lane line dividing traffic in the same <br /> ' direction of travel including plastic skip white lane line, and solid white edge line, or <br /> other line staked by the Engineer. <br /> HOT MIX ASPHALT OVERLAY 2017 PAGE 6 OF 10 MARCH 2017 <br /> WORK ORDER# PW 3642 <br /> DIVISION 8 <br />
The URL can be used to link to this page
Your browser does not support the video tag.