My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Granite Construction Company 5/24/2017
>
Contracts
>
Capital Contract
>
Granite Construction Company 5/24/2017
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
12/6/2017 10:26:42 AM
Creation date
6/5/2017 11:29:42 AM
Metadata
Fields
Template:
Contracts
Contractor's Name
Granite Construction Company
Approval Date
5/24/2017
Council Approval Date
5/10/2017
Department
Public Works
Department Project Manager
Narci Ricafrente
Subject / Project Title
Hot Mix Asphalt Overlay 2017 Project
Public Works WO Number
PW3642
Tracking Number
0000660
Total Compensation
$3,938,398.65
Contract Type
Capital Contract
Retention Period
10 Years Then Transfer to State Archivist
Document Relationships
Granite Construction Company 9/29/2017 Amendment 1
(Contract)
Path:
\Documents\City Clerk\Contracts\Capital Contract
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
214
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
5) All white parking lines shall be paint line. <br /> 6) All wide line, dotted extension line, arrows, symbols, and letters shall be Type D <br /> plastic flat line. <br /> ' 7) Access parking space symbols shall be Type D plastic flat line. <br /> 8-22.3(2) Preparation of Roadway Surfaces <br /> Section 8-22.3(2) is supplemented with the following: <br /> ' Apply materials to new HMA that is sufficiently cured according to the manufacturer's <br /> recommendation. Permanent paint marking material applied to new HMA require a <br /> pavement cure period of at least 21 days. Permanent Type D marking material applied <br /> to new HMA require a pavement cure period of at least 10 days. <br /> ' 8-22.4 Measurement <br /> Section 8-22.4 is supplemented read as follows: <br /> ' The measurement of crosswalk line and stop line will be based on the linear foot of 24" <br /> wide marking installed. <br /> ' 8-22.5 Payment <br /> Section 8-22.5 is supplemented read as follows: <br /> "24-inch Plastic Crosswalk Line", per Linear Foot <br /> "24-inch Plastic Stop Line", per Linear Foot <br /> SECTION 8-23 <br /> TEMPORARY PAVEMENT MARKINGS <br /> I <br /> 1 8-23.2 Materials <br /> Section 8-23.2 is supplemented read as follows: <br /> ' Materials for temporary markings shall be paint or reflectorized aluminum tape, as <br /> directed by the Engineer and selected from approved materials listed in the Qualified <br /> Products List. <br /> Temporary paint shall be used on subsurface pavements and may be paved over. <br /> Should sudden inclement weather create a pavement too wet to install temporary <br /> ' paint, temporary flexible raised pavement markers shall be installed on 40' intervals <br /> as directed by the Engineer. Temporary flexible raised pavement markers shall be <br /> selected from approved materials listed in the Qualified Products List. Temporary <br /> flexible raised pavement markers shall be nailed to the subsurface pavement and <br /> removed prior to paving. Reflectorized aluminum tape shall be used on new <br /> pavement and removed during permanent marking application. <br /> ' HOT MIX ASPHALT OVERLAY 2017 PAGE 7 OF 10 MARCH 2017 <br /> WORK ORDER# PW 3642 <br /> DIVISION 8 <br /> I <br />
The URL can be used to link to this page
Your browser does not support the video tag.