Laserfiche WebLink
8-23.5 Payment <br /> Section 8-23.5 is supplemented read as follows: <br /> Temporary Pavement Marking will be paid for under bid item "Temporary Pavement <br /> Markings" per linear foot. This shall be full pay for constructing, maintaining, and <br /> ' removing temporary lines and markers as specified. No additional compensation will <br /> be allowed when Contractor is required to repair temporary markings that have been <br /> damaged or worn. <br /> 1 <br /> ' SECTION 8-26 <br /> RESOLVE ABOVE GROUND CONFLICTS <br /> ' (NEW SECTION) <br /> VACATION SECTION 8-26 OF THE STANDARD SPECIFICATIONS IS REPLACE BY <br /> THE FOLLOWING: <br /> 8-26.1 Description <br /> This work shall consist of resolving above ground conflicts not covered by the plans and details. <br /> ' 8-26.2 Resolve Above Ground Conflicts <br /> ' Work necessary to resolve above ground conflicts, not covered by the plans and details, when <br /> directed by the Engineer. <br /> ' 8-26.3 Vacant <br /> 8-26.4 Measurement <br /> ' "Resolve Above Ground Conflicts" shall be measured by force account. <br /> 8-26.5 Payment <br /> Payment will be made for the following bid items when included in the proposal: <br /> "Resolve Above Ground Conflicts"by force account. <br /> i <br /> HOT MIX ASPHALT OVERLAY 2017 PAGE 8 OF 10 MARCH 2017 <br /> WORK ORDER# PW 3642 <br /> DIVISION 8 <br /> I <br />