My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Granite Construction Company 5/24/2017
>
Contracts
>
Capital Contract
>
Granite Construction Company 5/24/2017
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
12/6/2017 10:26:42 AM
Creation date
6/5/2017 11:29:42 AM
Metadata
Fields
Template:
Contracts
Contractor's Name
Granite Construction Company
Approval Date
5/24/2017
Council Approval Date
5/10/2017
Department
Public Works
Department Project Manager
Narci Ricafrente
Subject / Project Title
Hot Mix Asphalt Overlay 2017 Project
Public Works WO Number
PW3642
Tracking Number
0000660
Total Compensation
$3,938,398.65
Contract Type
Capital Contract
Retention Period
10 Years Then Transfer to State Archivist
Document Relationships
Granite Construction Company 9/29/2017 Amendment 1
(Contract)
Path:
\Documents\City Clerk\Contracts\Capital Contract
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
214
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
8-27 UNIFORMED POLICE OFFICER <br /> Section 8-27 is vacant and is replaced with the following: <br /> (******) <br /> 8-27.1 Description <br /> 1 This Contractor shall provide a uniformed police officer for flagging activities at traffic <br /> signal controlled intersections as described in Section 1-10.1(2). <br /> 8-27.3 Construction Requirements <br /> ' The Contractor shall provide uniformed police control at any time a signalized <br /> intersection is dark or inoperative, such as during grinding or paving operations where <br /> the traffic signal must be put into flashing operation. Signalized intersections shall not <br /> be police controlled between the hours of 6:00am and 8:30am nor 12:00pm to 7:30pm, <br /> unless directed by the Engineer. <br /> Coordination of uniformed Police control shall be with the following personnel, listed in <br /> ' order of preference: <br /> 1. City of Everett Police Officers Association <br /> ' Post Office Box 1253 <br /> Everett, WA 98201 <br /> Contacts: <br /> ' Officer Mike Bernardi (425) 327-9119 <br /> Officer Jack Jessup (425) 345-9935 <br /> 2. Puget Sound Executive Services <br /> 625 B 5th Avenue, Suite 4 <br /> Sequim, WA 98382 <br /> Contact: <br /> ' Nick Janssen (360) 681-7737 <br /> At the time of returning signals to normal operation, a city of Everett traffic signal <br /> ' technician will need to be on standby since most signals will not return to normal <br /> operation with a turn of the police panel switch and require a conflict monitor reset. <br /> ' Coordination of traffic signal technician shall be coordinated with the following personnel: <br /> 2. City of Everett Public Works <br /> ' 3200 Cedar Street <br /> Everett, WA 98201 <br /> Contact: <br /> Steve Sawyer (425) 328-0643 <br /> ' HOT MIX ASPHALT OVERLAY 2017 PAGE 9 OF 10 MARCH 2017 <br /> WORK ORDER# PW 3642 <br /> DIVISION 8 <br />
The URL can be used to link to this page
Your browser does not support the video tag.