Laserfiche WebLink
CITY OF EVERETT,WASHINGTON <br /> CONTRACT PROVISIONS FOR <br /> ' HOT MIX ASPHALT OVERLAY 2017 <br /> WORK ORDER NO. PW 3642 <br /> PROPOSAL <br /> To the City Council <br /> Everett, Washington <br /> The undersigned bidder declares that he has carefully examined the Plans and Specifications, Notice to <br /> ' Contractors, Instructions to Bidders, Standard Specifications, General Provisions, Special Provisions, <br /> Appendix, Proposal, and Contract for the construction of approximately 23,673 tons of Hot Mix <br /> Asphalt, Class1/2 inch, PG 64-22, two inches (2") thick, on selected City streets, including grinding, <br /> utility adjustments such as manhole, catch basin, inlet, valve boxes, monument case and cover, <br /> striping, channelization, traffic induction loop work, and other such work as may be necessary, in <br /> accordance with the Specifications, as shown on the Plans; that he has made such investigations as are <br /> necessary to determine the conditions to be encountered, and that if this Proposal is accepted he will <br /> enter into a contract with the City of Everett, Washington, in the form of Contract hereto annexed, will, <br /> to the extent required, provide the necessary equipment, tools, apparatus, and other means of <br /> construction, and will furnish all labor and materials as specified in these Contract Documents, or <br /> called for in the plans, or necessary to complete the work in the manner herein specified and according <br /> to the requirements of the Engineer. <br /> The undersigned bidder certifies that this Proposal is in all respects fair and is made without collusion <br /> on the part of any person, firm or corporation mentioned below, and no officer or employee of the City <br /> of Everett is personally or financially interested, directly or indirectly, in the Proposal or in any <br /> purchase of or sale of any materials or supplies for the work to which it relates, or any portion of the <br /> ' profits thereof <br /> The undersigned bidder agrees that he/she will physically complete the work within seventy four(74) <br /> ' working days from the date of written Notice to Proceed; that he/she will pay liquidated damages to <br /> the City in the amount specified in the Contract. <br /> ' Accompanying this Proposal is a bid bond or certified check in the amount of five percent (5%) of the <br /> Proposal according to the conditions of the "Notice to Contractors" and "Instructions to Bidders" <br /> hereby attached. If this Proposal shall be accepted by the City of Everett, Washington, and the <br /> undersigned shall fail to execute a satisfactory contract and bond, as stated in the Instructions to <br /> Bidders hereto attached, within twenty (20) calendar days after the award date,then the City may, at its <br /> option, determine that the undersigned has abandoned the Contract and thereupon this Contract shall <br /> be null and void and the amount of the bid bond or certified check accompanying this Proposal shall be <br /> forfeited and become the property of the City of Everett, Washington. <br /> HOT MIX ASPHALT OVERLAY 2017 Page 1 of 11 MARCH 2017 <br /> WORK ORDER#PW 3642 <br /> ' DIVISION P <br />