My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Granite Construction Company 5/24/2017
>
Contracts
>
Capital Contract
>
Granite Construction Company 5/24/2017
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
12/6/2017 10:26:42 AM
Creation date
6/5/2017 11:29:42 AM
Metadata
Fields
Template:
Contracts
Contractor's Name
Granite Construction Company
Approval Date
5/24/2017
Council Approval Date
5/10/2017
Department
Public Works
Department Project Manager
Narci Ricafrente
Subject / Project Title
Hot Mix Asphalt Overlay 2017 Project
Public Works WO Number
PW3642
Tracking Number
0000660
Total Compensation
$3,938,398.65
Contract Type
Capital Contract
Retention Period
10 Years Then Transfer to State Archivist
Document Relationships
Granite Construction Company 9/29/2017 Amendment 1
(Contract)
Path:
\Documents\City Clerk\Contracts\Capital Contract
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
214
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
IBID PROPOSAL <br /> CITY OF EVERETT,WASHINGTON <br /> IHOT MIX ASPHALT OVERLAY 2017 <br /> W.O.NO. PW 3642 <br /> I <br /> Note: Unit prices for all items,all extensions,and the total amount bid must be shown. Where conflict occurs between the unit price and <br /> U <br /> the total amount named for any item,the unit price shall prevail,and totals shall be corrected to conform thereto. All entries must be <br /> typed or entered in ink. <br /> BASIC BID ITEMS <br /> I <br /> BIDDER NAME GRANITE CONSTRUCTION COMPANY <br /> IITEM PLAN ITEM DESCRIPTION UNIT PRICE TOTAL <br /> NO. QUANTITY (Figures) AMOUNT <br /> I <br /> (Figures) <br /> 1 <br /> i. Mobilization oo co <br /> Lump Sum 353,toe). — 353 oa) - <br /> IPer L.S. <br /> 2. 7,650 Flaggers (Minimum Bid.Prevailing Wage) <br /> I <br /> Hour —Ili 5_ __0p• %a <br /> Per Hr. <br /> 1 3. 1 Project Temporary Traffic Control <br /> °a oz <br /> Lump Sum /7/,DOO. — /7/ POU <br /> IPer L.S. <br /> 4. 23,763 HMA Class 1/2 Inch, PG 64-22 <br /> VD <br /> Ton 70 00 j “,3`q/d - <br /> Per Ton <br /> 154 <br /> Each Adjust Manhole to Grade )00. O9 IJ �OO. <br /> IS. <br /> Per Each <br /> I6. 249 Adjust Catch Basin/Inlet to Grade <br /> Each <br /> loo . `o 2'1 <br /> t Per Each <br /> I <br /> HOT MIX ASPHALT OVERLAY 2017 Page 2 of 11 MARCH 2017 <br /> WORK ORDER#PW 3642 <br /> DIVISION P <br /> '�ided to Builders Exchange of WA, Inc. For usage Conditions Agreement see wwwbxwa.com-Always Verify Scale <br />
The URL can be used to link to this page
Your browser does not support the video tag.