Laserfiche WebLink
I <br /> IBASIC BID ITEMS <br /> ITEM PLAN ITEM DESCRIPTION UNIT PRICE TOTAL <br /> I NO. QUANTITY (Figures) AMOUNT <br /> (Figures) <br /> 28 <br /> 20. Each Plastic Traffic Letter <br /> I <br /> • 76 • ao <br /> 19 D (f2Per Each <br /> 5 <br /> 1 21. Hund red Raised Pavement Marker,Type 2 <br /> 732 .1-r° <br /> 3“ <br /> 0 <br /> Per Hundred <br /> I <br /> — <br /> 22. 790 <br /> Linear Feet Conduit Pipe 2"Diameter 23 . oo_ ?r x-70, <br /> • Per L.F. <br /> I23. 160 an /3 as <br /> Square Yard Removing Cement Concrete Sidewalk r7. 13,92o. <br /> Per S.Y. <br /> I <br /> 24. <br /> Square Yard Cement Concrete Sidewalk 2.1 7 . 34 72Q <br /> I <br /> Per S.Y. <br /> 25. 4,000 $1.00 $4,000.00 <br /> Estimate Resolve Above Ground Conflicts <br /> I Per Est. <br /> 26. 1,130 <br /> Hour Uniformed Police Officer 95" . 65) Jt77_ <br /> Per Hr. <br /> I 27. 80 vc� <br /> Hour Street Cleaning aQ 00 (kt4Qd <br /> Per Hr. <br /> I 28. 1,776 b <br /> Hour Portable Changeable Message Sign 3 . ,5 . <br /> Per Hr. <br /> I <br /> 1 <br /> 29. Lump Sum Spill Prevention Control Plan 5?,D . Qa SSD `191 Per L.S. <br /> ofl <br /> 30. Lump Sum Roadway Surveying 3�coo °o 3o 000 . <br /> I Per L.S. <br /> I CONTRACT TOTAL3� <br /> 393&'�3 9 6S <br /> I <br /> I <br /> I <br /> HOT MIX ASPHALT OVERLAY 2017 Page 4 of 11 MARCH 2017 <br /> WORK ORDER#PW 3642 <br /> DIVISION P <br /> Dilided to Builders Exchange of WA, Inc. For usage Conditions Agreement see www.bxwa.com -Always Verify Scale <br />