My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
KLB Construction Inc. 5/4/2017
>
Contracts
>
10 Years Then Transfer to State Archivist
>
2017
>
KLB Construction Inc. 5/4/2017
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/7/2017 10:07:48 AM
Creation date
6/7/2017 10:07:44 AM
Metadata
Fields
Template:
Contracts
Contractor's Name
KLB Construction Inc.
Approval Date
5/4/2017
Council Approval Date
4/19/2017
End Date
4/22/2017
Department
Public Works
Department Project Manager
Dave Voigt
Subject / Project Title
E Grand Ave Sewer System Repl & Stormwater
Public Works WO Number
UP3398
Tracking Number
0000699
Total Compensation
$0.00
Contract Type
Capital Contract
Retention Period
10 Years Then Transfer to State Archivist
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
2
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
CERTIFICATE OF COMPLETION <br /> Project: East Grand Avenue Sewer Replacement& Storm Water Separation <br /> Contractor: KLB Construction Inc. <br /> Work Order No. UP 3398 <br /> The above mentioned project was constructed per the plans and specifications and to the <br /> satisfaction of the Public Works Department. <br /> The Contractor physically completed the project, within the time allowed in the contract. <br /> It is recommended that the City accept this project as complete. <br /> Recommended by: <br /> i l r <br /> Public W!k')r:r•r _ Ia"- <br /> Dave Davis <br /> Approved by: <br /> 1624"' 14leaolq- <br /> Mayor, IL of Everett Date <br /> Ray Stephanson <br /> Attest:AA, / <br /> City Clerk <br /> Sharon Fuller <br /> APPROVED AS TO FORM <br /> By: /C---4- 111111-- <br /> Jim Iles, City Attorney <br /> Date <br />
The URL can be used to link to this page
Your browser does not support the video tag.