My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
3713 BROADWAY 2017-06-20
>
Address Records
>
BROADWAY
>
3713
>
3713 BROADWAY 2017-06-20
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/20/2017 1:14:43 PM
Creation date
6/9/2017 12:03:25 PM
Metadata
Fields
Template:
Address Document
Street Name
BROADWAY
Street Number
3713
Imported From Microfiche
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
172
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Electrical Design Development Guidance <br /> • Installation of the sidewalk along the project's street frontage will require adjustments to and <br /> possible installation of conduits,junction boxes and wiring for the City's street lighting and <br /> traffic signal systems. Consult with the City Traffic Engineering Department before beginning <br /> design work that involves sidewalk demolition. <br /> • The lighting system shall be upgraded to meet current City and Electrical Code standards <br /> regarding depth of conduit burial,junction box cover non-slip surface treatment, conduit size <br /> and number, conductor size and number,grounding and bonding, pole location (minimum 3' <br /> behind curb to CL of pole), etc. Light poles within 2' of the back of curb need to be relocated, <br /> preferably to back of sidewalk or in an established planter area (3' back of curb desired). Where <br /> required, illumination may need to be added to meet current City requirements. The City's <br /> typical installation involves LED cobra head fixtures on steel or aluminum poles, 30-35 feet <br /> mounting height, with an appropriate length mast arm. Overhead utilities may require utility <br /> owned and maintained arms and fixtures, but wherever possible City owned and operated poles <br /> shall be installed on all arterials. Within the Central Business District, pedestrian level decorative <br /> poles and LED fixtures are required. Tree pit receptacles may also be included. Revised lighting <br /> system details shall be provided on a separate plan. Consult with the City Traffic Engineering <br /> Department for detailed requirements. <br /> • On major arterials and at locations identified in the City of Everett's Strategic Fiber Initiative, <br /> two 4" PVC conduits shall be provided along the project frontage length for ITS purposes. <br /> Location and routing of ITS conduit system and installation of fiber optic rated vaults shall be <br /> provided on a separate plan detail. Consult with the City Traffic Engineering Department for <br /> detailed requirements. <br /> • Where required,the traffic signals along the frontage shall be modified to provide ADA <br /> accessible design, including satellite pedestrian poles, slip resistant junction boxes and curb <br /> ramps. Traffic signal loop modifications and/or additions shall support the proposed changes in <br /> channelization. Signal phasing modifications shall be implemented as required. Replacement of <br /> the traffic signal controller cabinet to support the revised phasing may be required. Location and <br /> design of traffic signal modification shall be provided on a separate plan detail. Consult with the <br /> City Traffic Engineering Department for detailed requirements. <br />
The URL can be used to link to this page
Your browser does not support the video tag.