Laserfiche WebLink
INSPECTION REPORT <br /> Date—0j 0 Permit: C o 1.ns <br /> Contractor: <br /> Owner: - ARZe <br /> Site Address: <br /> TYPE OF INSPECTION REQUESTED <br /> ELECTRICAL BUILDING MECHANICAL - PLUIVBING- <br /> ❑Temp Service ❑UFER ground ❑Groundwork/Slab []Groundwork/Slab <br /> ❑Groundwork ❑Footing ❑Rough In ❑Rough In <br /> ❑Slab/Conduit ❑Foundation ❑Ceiling Grid ❑Ceiling Grid <br /> ❑Rough in ❑Structural Slab ❑OK to insulate ❑OK to insulate <br /> ❑Service ❑Framing ❑Rooftop Units ❑Water Service <br /> ❑Grounding ❑Insulation ❑Mechanical Final ❑Medical Gas <br /> ❑Ceiling Grid ❑Drywall Nailing ❑Plumbing Final <br /> ❑Electrical Final ❑Shear Nailing GAS PIPE <br /> SITE WORK ❑Roof Nailing ❑Rough In/Service Hot Water Tank <br /> ❑Footing drains ❑ elling Grid ❑Refrigeration ❑Rough in <br /> ❑Roof drains I1XBuilding Final ❑Gas Pipe Final ❑HWT Final <br /> OT ER OR CONSULTATION: I6y�(rt_ — - 72ZZ <br /> PPROVAL ❑ PARTIALAPPROVAL FINAL APPROVAL ; iii PERMIT <br /> _ OK FOR T.C.O. F7 CORRECTION REQUESTED <br /> ❑ OK FOR C.O. ❑ VIOLATION <br /> ❑ UNABLE TO PERFORM INSPECTION: <br /> CALL(425)257-8881 FOR REINSPECTION-24 hour notice required <br /> Sj <br /> 0. <br /> v <br /> C✓a•C�.S �t D � <br /> L h <br /> Inspector: 20�,— Date: v <br /> DATABAR.INC. <br />