My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
8407 BROADWAY STADIUM STORAGE 2017-06-20
>
Address Records
>
BROADWAY
>
8407
>
STADIUM STORAGE
>
8407 BROADWAY STADIUM STORAGE 2017-06-20
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/20/2017 10:56:23 AM
Creation date
6/9/2017 2:32:59 PM
Metadata
Fields
Template:
Address Document
Street Name
BROADWAY
Street Number
8407
Tenant Name
STADIUM STORAGE
Imported From Microfiche
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
259
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
BMP 0105: Stabilized Construction Entrance <br /> Purpose Construction entrances are stabilized to reduce the amount of sediment <br /> transported onto paved roads by vehicles or equipment by constructing a <br /> stabilized pad of quarry spalls at entrances to construction sites. <br /> Conditions of Use Construction entrances shall be stabilized wherever traffic will be leaving <br /> a construction site and traveling on paved roads or other paved areas <br /> within 1,000 feet of the site. <br /> On large commercial,highway, and road projects, the designer should <br /> include enough extra materials in the contract to allow for additional <br /> stabilized entrances not shown in the initial Construction SWPPP. It is <br /> difficult to determine exactly where access to these projects will take <br /> place; additional materials will enable the contractor to install them where <br /> needed. <br /> Design and • See Figure 4.2 for details. Note: the 100' minimum length of the <br /> Installation entrance shall be reduced to the maximum practicable size when the <br /> .specifications size or configuration of the site does not allow the full length (100'). <br /> • A separation geotextile shall be placed under the spalls to prevent <br /> fine sediment from pumping up into the rock pad. The geotextile <br /> shall meet the following standards: <br /> [Grab Tensile Strength (ASTM D4751) 200 psi min. <br /> Grab Tensile Elongation (ASTM D4632) 30% max. <br /> Mullen Burst Strength (ASTM D3786-80a) 400 psi min. <br /> AOS (ASTM D4751) 20-45 (U.S. standard sieve size) <br /> • Consider early installation of the first lift of asphalt in areas that will <br /> paved; this can be used as a stabilized entrance. Also consider the <br /> installation of excess concrete as a stabilized entrance. During large <br /> concrete pours, excess concrete is often available for this purpose. <br /> • Hog fuel (wood-based mulch) may be substituted for or combined with <br /> quarry spalls in areas that will not be used for permanent roads. Hog <br /> fuel is generally less effective at stabilizing construction entrances and <br /> should be used only at sites where the amount of traffic is very limited. <br /> Hog fuel is not recommended for entrance stabilization in urban areas. <br /> The effectiveness of hog fuel is highly variable and it generally <br /> requires more maintenance than quarry spalls. The inspector may at <br /> any time require the use of quarry spalls if the hog fuel is not <br /> preventing sediment from being tracked onto pavement or if the hog <br /> fuel is being carried onto pavement. Hog fuel is prohibited in <br /> permanent roadbeds because organics in the subgrade soils cause <br /> degradation of the subgrade support over time. <br /> • Fencing(see BMPs C103 and C104) shall be installed as necessary to <br /> restrict traffic to the construction entrance. <br /> 4-8 Volume /I— Construction Stormwater Pollution Prevention February 2005 <br />
The URL can be used to link to this page
Your browser does not support the video tag.