My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
1108 CHESTNUT CT 2017-06-09
>
Address Records
>
CHESTNUT CT
>
1108
>
1108 CHESTNUT CT 2017-06-09
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/9/2017 3:43:27 PM
Creation date
6/9/2017 3:43:13 PM
Metadata
Fields
Template:
Address Document
Street Name
CHESTNUT CT
Street Number
1108
Imported From Microfiche
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
63
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
5. SOURCE CONTROL <br /> This project proposes to construct a proposed SFR and driveway on the parcel. Per <br /> Volume 1 of the City of Everett 2010 Stormwater Management Manual residential <br /> development does not require source control. <br /> 6. PRESERVATION OF NATURAL DRAINAGE SYSTEM <br /> The runoff from the new improvements will be dispersed as sheet flow over amended <br /> soils. By not grading or compacting the majority of the pervious surfaces to remain after <br /> construction in the area of disturbance a maximum amount of site runoff from the <br /> developed project will be absorbed and infiltrated into the existing on-site soils. This will <br /> mimic the existing conditions by maintaining the existing direction and condition of flow <br /> from this site. <br /> Chestnut North Lot 16-0213 <br /> February 2016 Page 9 <br />
The URL can be used to link to this page
Your browser does not support the video tag.