Laserfiche WebLink
Exhibit A <br /> Scope of Work <br /> Amendment No. 1 <br /> HVAC Support, Fiberglass Dormer Design Support, and Cost Estimate <br /> Stantec will provide additional HVAC support services, fiberglass dormer design support, a cost estimate <br /> and associated additional project management services under Amendment No 1 as follows: <br /> 1. Task 100 - PROJECT MANAGEMENT <br /> Stantec will provide additional project management activities associated with the additional scope <br /> of work described in this Amendment No 1. <br /> 2. TASK 200-DESIGN SERVICES <br /> A. Dormer Design Support: Add a fiberglass dormer to the structural design to provide a <br /> covered stairway entrance to the vault. Coordinate with the dormer manufacturer regarding <br /> cad files (manufacturer as identified by the City) and detailing the require anchoring to the <br /> concrete cover. <br /> B. HVAC Design Support: Provide limited HVAC design support services fo'r a ventilation <br /> system in the proposed new 3 Lakes valve vault, based on the assumptions listed, as follows: <br /> 1) Determine air flow rates required (by code). Probably based on required air exchanges <br /> when switch is turned on before man entry. See item 2 under assumptions below. <br /> 2) Size the intake and exhaust vent piping <br /> 3) Size a fan or blower for the air exchanges required <br /> 4) Provide a standard detail for typical vent pipes in and out of this type of vault. <br /> 5) Provide a spec or spec markup for the fan/blower <br /> 6) Provide coordination with electrical/I&C sub as needed. <br /> HVAC assumptions: <br /> 1) The City will add vent piping and fan to the City's mechanical sheets based on Stantec <br /> input. <br /> 2) The fan will not run continuously but would have the fan turned on when the hatch is <br /> opened. Operators will need to wait a prescribed time period for needed air exchanges <br /> before entry. <br /> C. Opinion of Probable Cost: Provide a AACE Class 4 estimate for the vault structure and <br /> miscellaneous metals based on the 90% design submittal. <br /> 1 <br />