Laserfiche WebLink
INSPECTION REPORT <br /> Date: ti 23J 1,OPermit: <br /> Contractor: <br /> Owner: ,�"1 <br /> Site Address: �� _� �d= <br /> TYPE OF INSPECTIUV REQUESTED <br /> ELECTRICAL BUILDING MECHANICAL PLUMBING <br /> ❑Temp Service ❑UFER ground ❑Groundwork/Slab ❑Groundwork/Slab <br /> ❑Groundwork ❑Footing ❑Rough In ❑Rough In <br /> ❑Slab/Conduit ❑Foundation ❑Ceiling Grid ❑Ceiling Grid <br /> ❑Rough In ❑Structural Slab ❑OK to insulate ❑OK to insulate <br /> ❑Service ❑Framing ❑ Rooftop Units ❑Water Service <br /> ❑Grounding ❑Insulation ❑Mechanical Final d Medical Gas <br /> ❑Ceiling Grid ❑Drywall NailingPlumbing Final <br /> ❑Electrical Final ElShear Nailing GAS PIPE Ix <br /> SITE WORK ❑Roof Nailing ❑Rough In/Service Hot Water Tank <br /> ❑Footing drains ❑Ceiling Grid ❑Refrigeration ❑ Rough In <br /> ❑Roof drains ❑Building Final ❑Gas Pipe Final ❑HWT Final <br /> 2q� <br /> OTHER OR CONSULTATION: �/' ✓-1 15• l/Y✓q: M <br /> � 1 t'ch-e((t <br /> APPROVAL ❑ PARTIAL APPROVAL FINAL APPROVAL THIS PERMIT <br /> K FOR T.C.O. ❑ CORRECTION REQUESTED <br /> ❑ OK FOR C.O. ❑ VIOLATION <br /> ❑ UNABLE TO PERFORM INSPECTION: <br /> ❑ CALL(425)257-8881 FOR REINSPECTION-24 hour notice required <br /> EIR(4/09) <br /> Inspector: ' <br />