Laserfiche WebLink
INSPECTION REPORT <br /> Date: 1� , Permit: 9 Q 1 <br /> Contractor: flC r <br /> Owner: i✓ ���� � <br /> Site Address: q, I _-P P X1'1 u'C <br /> TYPE OF INSPECTION REQUESTED <br /> ELECTRICAL BUILDING MECHANICAL PLUMBING <br /> ❑Temp Service ❑UFER ground ❑ Groundwork/Slab ❑ Groundwork/Slab <br /> ❑Groundwork ❑Footing ❑ Rough In ❑ Rough In <br /> ❑Slab/Conduit ❑Foundation ❑Ceiling Grid ❑Ceiling Grid <br /> ❑Rough In ❑Structural Slab ❑OK to insulate ❑OK to insulate <br /> ❑Service ❑Framing ❑ Rooftop Units ❑Water Service <br /> ❑Grounding ❑Insulation ❑ Mechanical Final ❑ Medical Gas <br /> ❑Ceiling Grid ❑Drywall Nailing ❑ Plumbing Final <br /> ❑Electrical Final Shear Nailing GAS PIPE <br /> SITE WORK Roof Nailing ❑Rough In/Service Hot Water Tank <br /> ❑Footing drains ❑Ceiling Grid ❑Refrigeration ❑ Rough In <br /> ❑Roof drains ❑Building Final ❑Gas Pipe Final ❑HWT Final <br /> OTHER OR CONSULTATION: <br /> PPROVAL ❑ PARTIAL APPROVAL FINAL APPROVAL THIS PERMIT <br /> ❑ OK FOR T.C.O. ❑ CORRECTION REQUESTED ❑ <br /> ❑ OK FOR C.O. ❑ VIOLATION <br /> ❑ UNABLE TO PERFORM INSPECTION: <br /> ❑ CALL(425)257-8881 FOR REINSPECTION-24 hour notice required <br /> © S � <br /> Inspector: / Date: <br /> r <br /> EIR(4/09) /C NA7"_$F�IORMS A PROMO NONS•42;/4811-6900 <br />