Laserfiche WebLink
3/3/2017 Page 1 <br /> City of Everett <br /> 12:58:02PM <br /> INSPECTION ACTIVITY REPORT <br /> Permit No. C1605-013 Site Address 2124 LEXINGTON AVE <br /> Applied 5/18/2016 Applicant HAACK BROS CONST INC Lot 2 <br /> Approved 7/8/2016 Owner HAACK BROS CONST INC Block <br /> Issued 7/18/2016 Contractor HAACK BROS CONST INC Tract <br /> Parent Permit No. Description NEW SFR <br /> Notes PROPERTY CORNERS MUST BE STAKED SO INSPECTOR CAN VERIFY SETBACK <br /> Requested Scheduled Result <br /> Time/By Completed Inspection Type Inspector Remarks Notes <br /> 7/26/2016 7/26/2016 UFER Ground BSM Approval <br /> 16:13 KMG 7/26/2016 <br /> 7/26/2016 7/26/2016 Footing BSM Approval <br /> 16:13 KMG 7/26/2016 <br /> 7/28/2016 7/28/2016 Foundation BSM Approval <br /> 15:45 MTM 7/28/2016 OK to pour foundation walls. <br /> 8/17/2016 8/15/2016 Underfloor KMK Approval Add squash block for 22"beam at garage <br /> 09:36 MTM 8/15/2016 See notes house wall. <br /> 8/16/2016 8/15/2016 Bldg Other KMK Corr Reqd ADD SQUASH BLOCK FOR 22"BEAM <br /> 15:23 CRB 8/15/2016 SEE NOTES AT GARAGE HOUSE WALL <br /> 9/2/2016 9/1/2016 ShearNailing KMK Approval <br /> 11:25 SDC 9/1/2016 OK to side <br /> 9/21/2016 9/20/2016 PlbgRoughIn SDP Approval <br /> 08:21 MTM 9/20/2016 <br /> 10/5/2016 10/5/2016 GasPiping SDP Approval Gas pipe rough-OK 15 PSI <br /> 15:53 SDC 10/5/2016 See notes OK for service <br /> 10/18/2016 10/14/2016 MechRoughln DXW PartialApproval <br /> 08:17 MTM 10/14/2016 Fireplace vent clearance OK. <br /> 10/21/2016 10/21/2016 MechRoughln DXW Approval Rough in Mechanical OK as noted. <br /> 16:01 MTM 10/21/2016 See notes At Final have paperwork hard duct at end of <br /> furnace in attic.R-8 at duct liner. <br /> 10/21/2016 10/21/2016 Framing KMK Approval <br /> 14:38 SDC 10/21/2016 OK to insulate <br /> 10/25/2016 10/25/2016 InsulBldg KMK Approval <br /> 16:35 MEM 10/25/2016 OK to sheet rock <br /> 10/28/2016 10/28/2016 DrywallNailing DWF Approval <br /> 16:03 MTM 10/28/2016 OK to cover(mud/tape) <br /> 2/9/2017 2/9/2017 Final Mech DXW Corr Reqd Hot water tank exhaust vent to be to <br /> 16:03 MTM 2/9/2017 See notes manufacturer spec or to IMC Must have <br /> paperwork to show what you did. <br /> 2/9/2017 2/9/2017 Final Plbg DXW Corr Reqd Complete relief line tooutside for hot water <br /> 16:02 MTM 2/9/2017 See notes tank. Complete trim on laundry box-low <br /> flow on water lines? <br /> 2/9/2017 2/9/2017 GasPipeFinal DXW Approval <br /> 16:03 MTM 2/9/2017 Gas pipe Final OK <br /> 2/9/2017 2/9/2017 Final Bldg DWF PartialApproval <br /> 16:19 MTM 2/9/2017 Approval subject to Mechanical Final <br /> 2/13/2017 2/9/2017 Mark Final** DWF Approval <br /> 14:00 TAH 2/9/2017 <br /> 2/10/2017 2/10/2017 Final Mech DXW Approval <br /> 15:46 MTM 2/10/2017 <br /> 2/10/2017 2/10/2017 Final Plbg DXW Approval <br /> 15:46 MTM 2/10/2017 <br /> 2/13/2017 2/14/2017 CO Issued TAH Approval <br /> 14:57 TAH co issued <br /> INSP_DETAILS <br />