My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Amendment 4 Floyd Snider
>
Contracts
>
6 Years Then Destroy
>
2018
>
Amendment 4 Floyd Snider
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/19/2017 10:46:47 AM
Creation date
6/19/2017 10:46:44 AM
Metadata
Fields
Template:
Contracts
Contractor's Name
Floyd Snider
Approval Date
6/15/2017
Council Approval Date
6/7/2017
End Date
6/30/2018
Department
Public Works
Department Project Manager
Mark Sadler
Subject / Project Title
Environmental Support for Deep Water Outfall
Amendment/Change Order
Amendment
Amendment/Change Order Number
4
Total Compensation
$54,065.00
Contract Type
Agreement
Contract Subtype
Professional Services
Retention Period
6 Years Then Destroy
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
7
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
601 Union Street, Suite 600 <br /> F L O Y D I SNIDER Seattle, WA 98101 <br /> strategy • science - engineering tel: 206.292.2078 fax:206.682.7867 <br /> Equipment Rates <br /> 2017 RATES <br /> Equipment Item Per Day Per Week <br /> Daily Use or Disposable Items <br /> Field Sampling Supplies, Tools, Disposables $30.00 NA <br /> Safety Equipment <br /> Level D Safety Equipment per Person (gloves, hearing $10.00 $40.00 <br /> protection, first aid) <br /> Road Safety Barricades $5.00 $20.00 <br /> Air Sampling Equipment <br /> Photoionization Detector(PID) $80.00 $320.00 <br /> SKC Air Pump $20.00 $80.00 <br /> Water Sampling Equipment <br /> Submersible Pump (12v) $40.00 $160.00 <br /> Peristaltic Pump $65.00 $260.00 <br /> Water Level Tape $25.00 $100.00 <br /> Oil/Water Interface Probe $35.00 $130.00 <br /> LaMotte Turbidity Meter $35.00 $130.00 <br /> Hanna pH/Conductivity Probe $20.00 $80.00 <br /> Horiba U-50 Multi-Parameter Water Quality Meter $100.00 $375.00 <br /> Data Acquisition Equipment <br /> Field Laptop Computer $30.00 $120.00 <br /> Pressure/Temp/Barometric Transducer/Dataloggers $65.00 $250.00 <br /> (per transducer) <br /> BarometricNacuum Sensor $5.00 $30.00 <br /> Tools <br /> Surveying Transit $20.00 $50.00 <br /> Stormwater Pole Sampler $15.00 $60.00 <br /> Trimble GPS $110.00 $400.00 <br /> Field Vehicles Per Rental Period Per Half Day Per Full Day <br /> Van: Toyota Sienna(>100 miles, a fuel surcharge of $70.00 $130.00 <br /> $25 will be billed in 100-mile increments) <br /> Notes: <br /> Field equipment needed for the project that is not included in this list will be purchased and billed at <br /> equipment cost plus 10 percent. <br /> Several small items used in field efforts are considered part of our overhead costs and are not billed <br /> separately.The items on this list are not considered part of overhead costs. <br /> f/contracts/masters/FS Equipment Rate Schedule <br />
The URL can be used to link to this page
Your browser does not support the video tag.