My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
540 ALVERSON BLVD 2017-06-20
>
Address Records
>
ALVERSON BLVD
>
540
>
540 ALVERSON BLVD 2017-06-20
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/20/2017 1:11:58 PM
Creation date
6/20/2017 1:11:55 PM
Metadata
Fields
Template:
Address Document
Street Name
ALVERSON BLVD
Street Number
540
Notes
GEOTECHNICAL REPORT INCLUDED
Imported From Microfiche
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
20
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
ameO <br /> at the bottom, as shown on Figure 3. The drainpipe should connect to a tightline collector pipe that <br /> discharges to a suitable location. <br /> Fill Placement and Compaction: We recommend that all soils located within the Geoweb cells, <br /> reinforced backfill and retained backfill zones be compacted to a uniform density of at least 90 percent <br /> (based on ASTM D-1557). <br /> RECOMMENDED ADDITIONAL SERVICES <br /> Because the future performance and integrity of the structural elements will depend largely on proper <br /> site preparation, drainage, and construction procedures, monitoring and testing by experienced <br /> geotechnical personnel should be considered an integral part of the construction process. <br /> Consequently, we recommend that AMEC be retained to provide the following post-report services: <br /> • Attend a pre-construction conference with the design team and contractor to discuss important <br /> geotechnical-related construction issues; <br /> • Observe the exposed subgrades after stripping and excavation to confirm that suitable soil <br /> conditions have been reached for placement of the toe of reinforced soil slope; <br /> • Verify geocell and geogrid type, spacing and installation procedures; <br /> • Monitor the placement and test the compaction of structural fill to verify conformance with the <br /> construction specifications; and <br /> • Observe the installation of all subsurface drainage. <br /> AMEC <br /> Project No.3-917-17245-A 5 <br /> W:\_Projects\17000s\17245 Alverson-Maul sby Bluff Property LLC\17245-A\Geotech Report\Finley Geotech Report 130722.docx <br />
The URL can be used to link to this page
Your browser does not support the video tag.