Laserfiche WebLink
ameO <br /> at the bottom, as shown on Figure 3. The drainpipe should connect to a tightline collector pipe that <br /> discharges to a suitable location. <br /> Fill Placement and Compaction: We recommend that all soils located within the Geoweb cells, <br /> reinforced backfill and retained backfill zones be compacted to a uniform density of at least 90 percent <br /> (based on ASTM D-1557). <br /> RECOMMENDED ADDITIONAL SERVICES <br /> Because the future performance and integrity of the structural elements will depend largely on proper <br /> site preparation, drainage, and construction procedures, monitoring and testing by experienced <br /> geotechnical personnel should be considered an integral part of the construction process. <br /> Consequently, we recommend that AMEC be retained to provide the following post-report services: <br /> • Attend a pre-construction conference with the design team and contractor to discuss important <br /> geotechnical-related construction issues; <br /> • Observe the exposed subgrades after stripping and excavation to confirm that suitable soil <br /> conditions have been reached for placement of the toe of reinforced soil slope; <br /> • Verify geocell and geogrid type, spacing and installation procedures; <br /> • Monitor the placement and test the compaction of structural fill to verify conformance with the <br /> construction specifications; and <br /> • Observe the installation of all subsurface drainage. <br /> AMEC <br /> Project No.3-917-17245-A 5 <br /> W:\_Projects\17000s\17245 Alverson-Maul sby Bluff Property LLC\17245-A\Geotech Report\Finley Geotech Report 130722.docx <br />