Laserfiche WebLink
* INSPECTION REPORT <br /> Date: Ih u Permit: t� i u o`1 —�_z <br /> _ CO3 Contractor:c O _)(�" 'e_\kC_ <br /> WV1 I 1 Owner: <br /> Site Address: <br /> TYPE OF INSPECTION REQUESTED <br /> ELECTRICAL BUILDING MECHANICAL PLUMBING <br /> Temp Service ❑UFER ground ❑ Groundwork/Slab ❑Groundwork/Slab <br /> ❑Groundwork ❑Footing ❑ Rough In ❑ Rough In <br /> ❑Slab/Conduit ❑Foundation ❑Ceiling Grid ❑Ceiling Grid <br /> ❑Structural Slab ❑OK to insulate ❑OK to insulate <br /> ❑Framing ❑ Rooftop Units ❑Water Service <br /> Gro g [1Insulation El Mechanical Final El Medical Gas <br /> Ceiling Grid ❑Drywall Nailing ❑Plumbing Final <br /> ❑Electrical Final ❑Shear Nailing GAS PIPE <br /> SITE WORK ❑Roof Nailing ❑Rough In/Service Hot Water Tank <br /> ❑Footing drains ❑Ceiling Grid ❑Refrigeration ❑ Rough In <br /> ❑Roof drains ❑Building Final ❑Gas Pipe Final ❑HWT Final <br /> OTH ONSULTATION: <br /> O L ❑ PARTIAL APPROVAL FINAL APPROVAL THIS PERMIT <br /> R T.C.O. ❑ CORRECTION REQUESTED ❑ <br /> ❑ OK FOR C.O. ❑ VIOLATION <br /> ❑ UNABLE TO PERFORM INSPECTION: <br /> ❑ CALL(425)257-8881 FOR REINSPECTION-24 hour notice required <br /> Inspector. Date: <br /> EIR(4/09) — Founas h ruon�oTioNs a ;Nnn-n�nn <br />