Laserfiche WebLink
INSPECTION REPORT <br /> Date: "/ o ��� Permit: <br /> E � /� <br /> Contractor: Cts <br /> F/" ` Owner: I /�/ K4CjA-,, <br /> �(,�Y�� <br /> Site Address: + 7, <br /> TYPE OF INSPECTION REQUESTED <br /> ELECTRICAL BUILDING MECHANICAL PLUMBING <br /> ❑Temp Service ❑UFER ground ❑Groundwork/Slab ❑ Groundwork/Slab <br /> ❑Groundwork ❑Footing ❑ Rough In ❑ Rough In <br /> ❑Slab/Conduit ❑Foundation ❑Ceiling Grid ❑Ceiling Grid <br /> ❑Rough In ❑Structural Slab ❑OK to insulate ❑OK to insulate <br /> ❑Service ❑Framing ❑ Rooftop Units ❑Water Service <br /> ❑Gr ❑Insulation ❑ Mechanical Final ❑Medical Gas <br /> Ceiling Gr d ❑Drywall Nailing ❑Plumbing Final <br /> lectrI al Final ❑Shear Nailing GAS PIPE <br /> SITE WORK ❑Roof Nailing ❑Rough In/Service Hot Water Tank <br /> ❑Footing dr ' ❑Ceiling Grid ❑Refrigeration ❑ Rough In <br /> ID <br /> ❑Building Final ❑Gas Pipe Final ❑HWT Final <br /> OTHER OR CONSULTATION: <br /> ❑ APPROVAL ❑ PARTIAL APPROVAL FINAL APPROVAL THIS P Riu1+� <br /> ❑ OK FOR T.C.O. ❑ CORRECTION REQUESTED <br /> ❑ OK FOR C.O. ❑ VIOLATION I(u� <br /> ❑ UNABLE TO PERFORM INSPECTION: <br /> CALL(425)257-8881 FOR REINSPECTION-24 hour notice required <br /> Inspecto Date: <br /> r <br /> EIR(4/09) yr/�1 ii un4c x ruo...... Ns .",/4118-8900 <br />