Laserfiche WebLink
INSPECTION REPORT t(7p� rA-Swt <br /> Date' (3 0 Permit: l-1 O ` —OUB <br /> Contractor: <br /> Owner: <br /> Site Address: v5 �I L <br /> TYPE OF INSPECTION REQUESTED <br /> ELECTRICAL BUILDING MECHANICAL PLU ING `C <br /> ❑Temp Service ❑UFER ground ❑Groundwork/Slab ❑Groundwork/Slab <br /> ❑Groundwork ❑Footing ❑Rough In ❑Rough In <br /> ❑Slab/Conduit ❑Foundation ❑Ceiling Grid ❑Ceiling Grid <br /> ❑Rough In ❑Structural Slab ❑OK to insulate ❑OK to insulate <br /> ❑Service ❑Framing ❑Rooftop Units ❑Water Service <br /> ❑Grounding ❑Insulation ❑Mechanical Final Me cal Gas <br /> ❑Ceiling Grid ❑Drywall Nailinglumbing Final <br /> F-1Electrical Final ❑Shear Nailing GAS PIPE <br /> SITE WORK ❑Roof Nailing ❑Rough In/Service Hot Water Tank <br /> ❑Footing drains ❑Ceiling Grid ❑Refrigeration ❑Rough in <br /> ❑Roof drains ❑Building Final ❑Gas Pipe Final ❑HWT Final <br /> OTHER OR CONSULTATION: <br /> ❑ APPROVAL ❑ PARTIAL APPROVAL FINAL APPROVAL THIS PERMIT <br /> ❑ OK FOR T.C.O. ❑ CORRECTION REQUESTED <br /> ❑ QK FOR C.O. ❑ VIOLATION <br /> UNABLE TO PERFORM INSPECTION: <br /> ❑ LL(425)257-8881 FOR REINSPECTION-24 hour notice required <br /> 1�SIy <br /> A)c,77L: ZAjs P&ZW9,g L4!Ztf- 7b e- 167- <br /> I!J5eo0 A-iv D <br /> Inspector: Date: 1-3 <br /> EIR(10/06) DATABAR,INC. <br />