Laserfiche WebLink
GENERAL NOTES: GENERAL NOTES (CONT'D): GENERAL NOTES(CONT'D): m N <br /> 1. VERIFY AND CONFIRM ALL DIMENSIONS AND CONDITIONS. NOTIFY AT&T <br /> AND ARCHITECT OF ANY DISCREPANCIES PRIOR TO START OF WORK. 44. THE CONTRACTOR SHALL PROVIDE ALL NECESSARY BACKING, BLOCKING, > <br /> 24. WHERE ANCHORING TO A CONCRETE ROOF SLAB, CONTRACTOR SHALL AND/OR SLEEVES REQUIRED FOR THE INSTALLATION OF FIXTURES, - <br /> 2. DRAWINGS ARE NOT TO BE SCALED, WRITTEN DIMENSIONS TAKE CONFIRM (PRIOR TO SUBMITTING BID) WITH CONSULTING CONSTRUCTION MECHANICAL EQUIPMENT, PLUMBING, HARDWARE, AND FINISH ITEMS TO OJ C <br /> PRECEDENCE,THIS SET OF DOCUMENTS IS INTENDED TO BE USED FOR COORDINATOR AND ARCHITECT THE PRESENCE OF POST TENSION INSURE A PROPER AND COMPLETE JOB. Q Z <br /> DIAGRAMMATIC PURPOSES ONLY, UNLESS NOTED OTHERWISE. THE TENDONS. CONTRACTOR SHALL INCLUDE PROVISIONS FOR X-RAY 45. THE CONTRACTOR IS RESPONSIBLE FOR PROVIDING A PROJECT LEVEL, <br /> GENERAL CONTRACTOR'S SCOPE OF WORK SHALL INCLUDE FURNISHING PROCEDURES TO LOCATE THE TENDONS. STRAIGHT,AND TRUE ACCORDING TO THE PIANS. THE CONTRACTOR <br /> ALL MATERIALS, EQUIPMENT, LABOR,AND ANY REQUIREMENTS DEEMED SHALL COMPARE THE LINES AND LEVELS OF THE EXISTING CONDITIONS L � <br /> AND OWNER'S PROJECT MANUAL. J <br /> NECESSARY TO COMPLETE PROJECT AS DESCRIBED IN THE DRAWINGS 25. CONTRACTOR SHALL USE STAINLESS STEEL METAL LOCKING TIES FOR WITH THOSE SHOWN ON THE PLANS PRIOR TO THE START OF ANY i L <br /> ALL CABLE TRAY TIE DOWNS AND ALL OTHER GENERAL TIE DOWNS <br /> CONSTRUCTION. TOWER NETWORK CARRIER SHALL BE NOTIFIED OF ANY O <br /> (WHERE APPLICABLE). PLASTIC ZIP TIES SHALL NOT BE PERMITTED FOR USE ON AT&T PROJECTS. RECOMMENDED MANUFACTURER SHALL BE: ERRORS, OMISSIONS, OR INCONSISTENCIES PRIOR TO ANY <br /> O <br /> 3. PRIOR TO THE SUBMISSION OF BIDS, CONTRACTORS INVOLVED SHALL CONSTRUCTION. <br /> VISIT THE JOB SITE TO FAMILIARIZE THEMSELVES WITH ALL CONDITIONS PANDUR CORP. METAL LOCKING TIES MODEL NO. MlT4S-CP UNDER L <br /> AFFECTING THE PROPOSED PROJECT. CONTRACTORS SHALL VISIT THE SERIES-304 (OR EQUAL). PANDUR PRODUCT DISTRIBUTED BY TRIARC 46. THE CONTRACTOR IS TO PROVIDE PROTECTION FOR ADJOINING (n <br /> CONSTRUCTION SITE WITH THE CONSTRUCTION/CONTRACT DOCUMENTS TO REQUIRED BY THE GOVERNING AGENCIES. <br /> OF TACOMA, WA. PROPERTIES FROM PHYSICAL HARM, NOISE, DUST, DIRT,AND FIRE AS Q) <br /> (/�\�] J U <br /> VERIFY FIELD CONDITIONS AND CONFIRM THAT THE PROJECT WILL BE <br /> ACCOMPLISHED AS SHOWN. PRIOR TO PROCEEDING WITH26. MAINTAIN THE INTEGRITY OF THE BUILDING ENVELOP AND CONSTRUCT <br /> BARRIERS IN THE AREA OF WORK TO PREVENT DAMAGE FROM WEATHER 47. WHERE SPECIFIED, MATERIALS TESTING SHALL BE TO THE LATEST <br /> CONSTRUCTION, ANY ERRORS,OMISSIONS, OR DISCREPANCIES SHALL BE AND CONSTRUCTION DUST AND DEBRIS. STANDARDS AND/OR REVISIONS AVAILABLE AS REQUIRED BY THE N <br /> BROUGHT TO THE ATTENTION OF THE ARCHITECT/ENGINEER VERBALLY GOVERNING AGENCY RESPONSIBLE FOR RECORDING THE RESULTS. (/) <br /> AND IN WRITING. 27. THE CONTRACTOR SHALL NOTIFY TOWER NETWORK CARRIER OF ANY 48. THE CONTRACTOR IS RESPONSIBLE FOR THE STORAGE OF ALL W 1n <br /> 4. AT&T,AND THE ARCHITECTS/ENGINEERS HAVE MADE EVERY EFFORT TO ERRORS, OMISSIONS, OR INCONSISTENCIES AS THEY MAY BE MATERIALS AND SHALL NOT DO SO ON PUBLIC PROPERTY WITHOUT A z O) <br /> SET FORTH IN THE CONSTRUCTION AND CONTRACT DOCUMENTS THE DISCOVERED IN PUNS, DOCUMENTS, NOTES, OR SPECIFICATIONS PRIOR PERMIT 70 DO SO FROM THE GOVERNING AGENCIES FOR THIS PURPOSE. Z N <br /> COMPLETE SCOPE OF WORK. CONTRACTORS BIDDING THE JOB ARE DE STARTING CONSTRUCTION INCLUDING, BUT NOT LIMITED BY, ■�� 12 <br /> NEVERTHELESS CAUTIONED THAT MINOR OMISSIONS OR ERRORS IN THE DEMOLITION. THE CONTRACTOR SHALL BE RESPONSIBLE FOR CORRECTING 49. GENERAL NOTES AND STANDARD DETAILS ARE THE MINIMUM W <br /> DRAWINGS AND OR SPECIFICATIONS SHALL NOT EXCUSE SAID ANY ERROR, OMISSION, OR INCONSISTENCY AFTER HE START OF REQUIREMENTS TO BE USED IS CONDITIONS WHICH ARE NOT ■w <br /> CONTRACTOR FROM COMPLETING THE PROJECT AND IMPROVEMENTS IN CONSTRUCTION WHICH HAS NOT BEEN BROUGHT TO THE ATTENTION OF SPECIFICALLY SHOWN OTHERWISE. u <br /> 1)))) <br /> ACCORDANCE WITH THE INTENT OF THESE DOCUMENTS. THE BIDDER TOWER NETWORK CARRIER CONSTRUCTION PROJECT MANAGER AND SHALL INCUR ANY EXPENSES TO RECTIFY THE SITUATION. THE MEANS 50. TRADES INVOLVED IN THE PROJECT SHALL BE RESPONSIBLE FOR THEIR <br /> OWN CUTTING, FITTING, PATCHING, ETC., SO AS TO BE RECEIVED <br /> SHALL BUR THE RESPONSIBILITY OF NOTIFYING(INRR WRITING)AT&T,ISSIAND OF CORRECTING ANY ERROR THALL FIRST BE APPROVED BY TOWER PROPERLY BY THE WORK OF OTHER TRADES. <br /> THE ARCHITECT/ENGINEER OF ANY CONFLICTS, ERRORS,OR OMISSIONS NETWORK CARRIER CONSTRUCTION PROJECT MANAGER. <br /> PRIOR TO SUBMISSION OF CONTRACTOR'S PROPOSAL. IN THE EVENT 28. DRAWINGS ARE NOT TO BE SCALED UNDER ANY CIRCUMSTANCE. TOWER 51. ALL DEBRIS AND REFUSE IS TO BE REMOVED FROM THE PROJECT <br /> OF DISCREPANCIES THE CONTRACTOR SHALL PRICE THE MORE COSTLY PREMISES AND SHALL BE LEFT IN A CLEAN (BROOM FINISH) CONDITION <br /> NETWORK CARRIER IS NOT RESPONSIBLE FOR ANY ERRORS RESULTING <br /> OR EXTENSIVE WORK, UNLESS DIRECTED OTHERWISE. AT ALL TIMES BY EACH TRADE AS THEY PERFORM THEIR OWN PORTION <br /> FROM THIS PRACTICE WRITTEN DIMENSIONS TAKE PRECEDENCE OVER Of THE WORK. <br /> 5. THE CONTRACTOR SHALL SUPERVISE AND DIRECT THE PROJECT SCALE SHOWN ON PUNS. <br /> DESCRIBED IN THE CONTRACT DOCUMENTS. THE CONTRACTOR SHALL 29. OWNER, CONTRACTOR,AND TOWER NETWORK CARRIER CONSTRUCTION 52. TOWER NETWORK CARRIER DOES NOT GUARANTEE ANY PRODUCTS, <br /> BE SOLELY RESPONSIBLE FOR ALL CONSTRUCTION MEANS, METHODS, PROJECT MANAGER SHALL MEET JOINTLY TO VERIFY ALL DRAWINGS AND FIXTURES,AND/OR ANY EQUIPMENT NAMED BY A TRADE OR <br /> TECHNIQUES, SEQUENCES, AND PROCEDURES FOR COORDINATING ALL SPECIFICATIONS PRIOR TO THE START OF CONSTRUCTION. MANUFACTURER. GUARANTEE OR WARRANTY THAT MAY BE IN EFFECT IS <br /> PORTIONS OF THE WORK UNDER THE CONTRACT. DONE SO THROUGH THE COMPANY OR MANUFACTURER PROVIDING THE <br /> 30, A COPY OF GOVERNING AGENCY APPROVED PUNS SHALL BE KEPT IN A PRODUCT, FIXTURE,AND/OR EQUIPMENT ONLY: UNLESS SPECIFIC <br /> 6. THE CONTRACTOR SHALL INSTALL ALL EQUIPMENT AND MATERIALS PUCE SPECIFIED BY THE GOVERNING AGENCY, AND BY LAW, SHALL BE RESPONSIBILITY IS ALSO PROVIDED BY THE <br /> D -"p+ <br /> ACCORDING TO MANUFACTURER'S/VENDOR'S SPECIFICATIONS UNLESS AVAILABLE FOR INSPECTION AT ALL TIMES. THE PUNS ARE NOT TO BE CONTRACTOR/SUBCONTRACTOR IN WRR �ITEN FORM. <br /> NOTED OTHERWISE OR WHERE LOCAL CODES OR ORDINANCES TAKE USEBY THE WORKMEN. ALL CONSTRUCTION SETS SHALL REFLECT THE <br /> PRECEDENCE. SAME INFORMATION AS GOVERNING AGENCY APPROVED PUNS. THE 53. CONTRACTOR TO REPLACE AND/OR REROUTE ANY EXISTING ASSOCIATES <br /> CONTRACTOR SHALL ALSO MAINTAIN ONE SET OF PLANS, IN GOOD UNDERGROUND UTILITIES ENCOUNTERED DURING TRENCHING AND <br /> 7. ALL WORK PERFORMED ON THE PROJECT AND MATERIALS INSTALLED CONDITION, COMPLETE WITH ALL REVISIONS,ADDENDA, AND CHANGE GENERAL CONSTRUCTION. <br /> SHALL BE IN STRICT ACCORDANCE WITH ALL APPLICABLE CODES, ORDERS ON THE PREMISES AT ALL TIMES UNDER THE DIRECT CARE OF <br /> REGULATIONS,AND ORDINANCES. CONTRACTOR SHALL GIVE ALL NOTICES THE SUPERINTENDENT. THE CONTRACTOR SHALL SUPPLY TOWER 54. CONTRACTOR TO LOCATE ALL UTILITIES PRIOR TO PLACEMENT OF 19401 40TH AVE.W.,SUITE 304 <br /> NETWORK CARRIER CONSTRUCTION PROJECT MANAGER. WITH A COPY OF MONOPOLE FOOTING AND OTHER STRUCTURES TO BE PLACED IN LYNNWOOD,WA 96036 <br /> AND COMPLY WITH ALL LAWS, ORDINANCES, RULES, REGULATIONS AND PHFAX:(4(425)740-6392 <br /> LAWFUL ORDERS <br /> OF ANY PUBLIC AUTHORITY, MUNICIPAL AND UTILITY ALL REVISIONS,ADDENDA,AND/OR CHANGE ORDERS AT THE GROUND. SEE GENERAL NOTE M6 ON THIS SHEET. FAX:(425)224-1614 <br /> COMPANY SPECIFICATIONS, AND LOCAL AND STATE JURISDICTIONAL CONCLUSION OF THE WORK AS A PART OF THE AS-BUILT DRAWING 55. SEE CIVIL DRAWINGS FOR ADDITIONAL SITE INFORMATION. WWW-CAMPASSOC.COM <br /> CODES BEARING ON THE PERFORMANCE OF THE WORK. RECORDS. <br /> 31. THE CONTRACTOR SHALL STUDY THE STRUCTURAL, ELECTRICAL, 56. CONTRACTOR TO DOCUMENT ALL WORK PERFORMED WITH PHOTOGRAPHS <br /> B. CONTRACTOR SHALL PROVIDE,AT THE PROJECT SITE, A FULL SET OFAND SUBMIT TO TOWER NETWORK CARRIER ALONG WITH REDLINED <br /> MECHANICAL,AND PLUMBING PLANS AND CROSS CHECK THEIR DETAILS, <br /> CONSTRUCTION DOCUMENTS UPDATED WITH THE LATEST REVISIONS AND NOTES, DIMENSIONS,AND ALL REQUIREMENTS PRIOR TO THE START Of CONSTRUCTION SET. DATE: 3/21/tE <br /> ADDENDA OR CLARIFICATIONS FOR USE BY ALL PERSONNEL INVOLVED ANY WORK. 57. CONTRACTOR TO DOCUMENT ALL CHANGES MADE IN THE FIELD BY <br /> WITH THE PROJECT. MARKING UP (REDLINING)THE APPROVED CONSTRUCTION SET AND DRAWN BY: CA <br /> 32. THE CONTRACTOR SHALL BE RESPONSIBLE FOR THE COMPLETE SUBMITTING THE REDLINED SET TO TOWER NETWORK CARRIER UPON <br /> 9. THE STRUCTURAL COMPONENTS OF ADJACENT CONSTRUCTION OR SECURITY OF THE PROJECT AND SITE WHILE THE WORK IS IN PROGRESS COMPLETION. CHECKED BY: PN <br /> FACILITIES ARE NOT TO BE ALTERED BY THIS CONSTRUCTION PROJECT UNTIL THE JOB IS COMPLETE. <br /> UNLESS NOTED OTHERWISE. ENSURE THAT EXCAVATION DOES NOT 58. THE GENERAL CONTRACTOR SHALL BE RESPONSIBLE FOR AND SHALL <br /> AFFECT ADJACENT STRUCTURES. 33. THE CONTRACTOR HAS THE RESPONSIBILITY OF LOCATING ALL EXISTING , , <br /> UTILITIES WHETHER OR NOT SHOWN ON THE PUNS,AND TO PROTECT REMEDY ALL FAULTYINFERIORAND/OR IMPROPER MATERIALS, DAMAGED <br /> 10. SEAL ALL PENETRATIONS THROUGH FIRE-RATED AREAS WITH U.L. LISTED THEM FROM DAMAGE. THE CONTRACTOR, OR SUBCONTRACTOR AS GOODS, AND/OR FAULTY WORKMANSHIP FOR ONE (1) YEAR AFTER THE <br /> OR FIRE MARSHALL APPROVED MATERIALS IF APPLICABLE TO THIS SPECIFIED IN THE AGREEMENT BETWEEN SUBCONTRACTOR AND PROJECT IS COMPETE AND ACCEPTED UNDER THIS CONTRACT; UNLESS REVISIONS <br /> FACILITY AND OR PROJECT SITE. CONTRACTOR, SHALL BEAR THE EXPENSES OF REPAIR AND/OR NOTED OTHERWISE IN THE CONTRACT BETWEEN THE OWNER AND THE REV.: DATE: DESCRIPTION: BY: <br /> REPLACEMENT OF UTILITIES OR OTHER PROPERTY DAMAGE BY CONTRACTOR. (EXCEPTION) THE ROOFING SUBCONTRACTOR SHALL1SSUED FOR <br /> 11, CONTRACTOR TO PROVIDE A PORTABLE FIRE EXTINGUISHER WITH A OPERATIONS IN CONJUNCTION WITH THE EXECUTION OF THE WORK, FURNISH A MAINTENANCE AGREEMENT FOR ALL WORK DONE, COSIGNED 0 QOl/15/i6D REVIEW GA <br /> RATING OF NOT LESS THAN 2-A OR 2-A10BC WITHIN 75 FEET TRAVEL BY THE GENERAL CONTRACTOR, TO MAINTAIN THE ROOFING IN A ISSUED FOR <br /> DISTANCE TO ALL PORTIONS OF PROJECT AREA DURING CONSTRUCTION. 34. THE REFERENCES ON THE DRAWINGS ARE FOR CONVENIENCE ONLY AND WATERTIGHT CONDITION FOR A PERIOD OF TWO (2)YEARS STARTING Qj 3/21/16 FINAL OCA <br /> SHALL NOT LIMIT THE APPLICATION OF ANY DRAWING OR DETAIL. AFTER THE DATE OF SUBSTANTIAL COMPLETION OF THE PROJECT, <br /> 12. CONTRACTOR SHALL MAKE NECESSARY PROVISIONS TO PROTECT EXISTING 35. ALL DIMENSIONS ON THE PLANS ARE TO FACE OF STUD (F.O.S.) UNLESS OTHERWISE WRITTEN IN THE CONTRACT BETWEEN THE OWNER <br /> IMPROVEMENTS, EASEMENTS, PAVING, CURBING, ETC. DURING UNLESS NOTED OTHERWISE (U.N.O.). AND THE CONTRACTOR. <br /> CONSTRUCTION. UPON COMPLETION OF WORK, CONTRACTOR SHALL 59. THE CONTRACTOR SHALL PROVIDE ADEQUATE PROTECTION FOR THE - <br /> REPAIR ANY DAMAGE THAT MAY HAVE OCCURRED DUE TO CONSTRUCTION 36. ALL EXISTING CONSTRUCTION, EQUIPMENT,AND FINISHES NOTED TO BE SAFETY OF THE OWNER'S EMPLOYEES, WORKMEN, AND ALL TIMES <br /> ON OR ABOUT THE PROPERTY, REMOVED SHALL BECOME THE PROPERTY OF THE CONTRACTOR AND DURING THE CONSTRUCTION OF THE PROJECT. <br /> WILL BE REMOVED FROM THE SITE WITH THE FOLLOWING EXCEPTIONS: <br /> 13. CONTRACTOR SHALL KEEP GENERAL WORK AREA CLEAN AND HAZARD A. PROPERTY NOTED TO BE RETURNED TO THE OWNER. 60. THE CONTRACTOR SHALL BE REQUIRED TO PAY FOR ALL NECESSARY <br /> FREE DURING CONSTRUCTION AND DISPOSE OF ALL DIRT, DEBRIS, AND PERMITS AND/OR FEES WITH RESPECT TO THE WORK TO COMPLETE THE <br /> RUBBISH. CONTRACTOR SHALL REMOVE EQUIPMENT NOT SPECIFIED AS B. PROPERTY NOTED TO BE REMOVED BY THE OWNER. PROJECT. BUILDING PERMIT APPLICATIONS SHALL BE FILED BY THE ----- <br /> REMAINING ON THE PROPERTY OR PREMISES. SITE SHALL BE LEFT IN 37, THE GOVERNING AGENCIES, CODE AUTHORITIES, AND BUILDING OWNER OR HIS REPRESENTATIVE. CONTRACTOR SHALL OBTAIN PERMIT <br /> CLEAN CONDITION AND FREE FROM PAINT SPOTS, DUST, OR SMUDGES INSPECTORS SHALL PROVIDE THE MINIMUM STANDARDS FOR AND MAKE FINAL PAYMENT FOR SAID DOCUMENT. - <br /> OF ANY NATURE. CONSTRUCTION TECHNIQUES, MATERIALS, AND FINISHES USED <br /> 61. THE ARCHITECT/ENGINEER IN CHARGE SHALL SIGN AND SEAL ALL <br /> 14. THE CONTRACTOR SHALL RECEIVE WRITTEN AUTHORIZATION TO PROCEED THROUGHOUT THE PROJECT.TRADE STANDARDS AND/OR PUBLISHED DRAWINGS AND/OR SPECIFICATIONS. <br /> WITH CONSTRUCTION PRIOR TO STARTING WORK ON ANY REM NOT MANUFACTURERS SPECIFICATIONS MEETING OR EXCEEDING DESIGN - -- - - <br /> CLEARLY DEFINED BY THE CONSTRUCTION DRAWINGS/CONTRACT REQUIREMENTS SHALL BE USED FOR INSTALLATION. 62. TOWER NETWORK CARRIER WILL REVIEW AND APPROVE SHOP DRAWINGS <br /> DOCUMENTS. 38. WHEN REQUIRED STORAGE OF MATERIALS OCCURS, THEY SHALL BE AND SAMPLES FOR CONFORMANCE WITH DESIGN CONCEPT. TOWER 772 REGISTERED <br /> EVENLY DISTRIBUTED OVER ROUGH FRAMED FLOORS OR ROOFS SO AS NETWORK CARRIER PROJECT APPROVAL OF A SEPARATE ITEM SHALL NOT <br /> 15. THE CONTRACTOR SHALL PERFORM WORK DURING OWNER'S PREFERRED NOT TO EXCEED THE DESIGNED LIVE LOADS FOR THE STRUCTURE. INCLUDE APPROVAL OF AN ASSEMBLY IN WHICH THE ITEM FUNCTIONS. I E <br /> HOURS TO AVOID DISTURBING NORMAL BUSINESS. TEMPORARY SHORING AND/OR BRACING IS TO BE PROVIDED WHERE THE 63. ALL ANTENNAS MOUNTED ON ROOF SUPPORT FRAMES TO BE PROVIDED A R C Fll CVT <br /> STRUCTURE HAS NOT ATTAINED THE DESIGN STRENGTH FOR THE BY TOWER NETWORK CARRIER COMMUNICATIONS. <br /> 16. THE CONTRACTOR SHALL PROVIDE AT&T. PROPER INSURANCE CONDITIONS PRESENT. 64. CONTRACTOR TO PROVIDE TRENCH AS REQUIRED TO INSTALL BOTH <br /> CERTIFICATES NAMING AT&T.AS SU ADDITIONAL INSURED,AND AT&T. PROOF 39. PRIOR TO THE POURING OF ANY NEW SLAB OVER AN EXISTING SLAB ELECTRICAL AND TELEPHONE UNDERGROUND CONDUITS (#40 PVC) PER <br /> OF LICENSE(5)AND PE & PD INSURANCE. THE CONTRACTOR SHALL VERIFY LOCATIONS OF ALL OPENINGS, CHASES, S.C.E. WORKORDER. BACKFILL WITH CLEAN SAND AND COMPACT TO THE <br /> 17. CONTRACTOR SHALL BE RESPONSIBLE FOR SCHEDULING AND AND EQUIPMENT WHICH ARE TO BE IMPLEMENTED INTO THE NEW WORK. SATISFACTION OF THE DISTRICTS INSPECTOR. REPLACE FINISH GRADE U L N I <br /> COORDINATING ALL INSPECTIONS. ALL ITEMS DESIGNATED TO BE ABANDONED SHALL BE NOTED AND WITH MATCHING MATERIALS (GRASS,ASPHALT, CONCRETE, ETC.) VZT/T 0' <br /> A SHIN 4GTO N <br /> DISCUSSED WITH THE OWNER AND TOWER NETWORK CARRIER 65. CONTRACTOR TO PROVIDE HEAVY STEEL PLATES AT OPEN TRENCHES <br /> 18. CAUTION! CALL BEFORE YOU DIG! BURIED UTILITIES EXIST IN THE CONSTRUCTION PROJECT MANAGER AS PART Of THE AS-BUILT DRAWING FOR SAFETY AND TO PROTECT EXISTING GROUND SURFACES FROM X13,�'-"0 <br /> AREA AND UTILITY INFORMATION SHOWN MAY NOT BE COMPLETE. PACKAGE. HEAVY EQUIPMENT UTILIZED DURING CONSTRUCTION. <br /> CONTACT THE ONE-CALL UTILITY LOCATE SERVICE A MINIMUM OF 48 40. BUILDING INSPECTORS AND/OR OTHER BUILDING OFFICIALS ARE TO BE <br /> HOURS PRIOR TO CONSTRUCTION. IN WASHINGTON CALL: NOTIFIED PRIOR TO ANY GRADING, CONSTRUCTION,AND ANY OTHER 66. CONTRACTOR TO PATCH AND REPAIR ALL GROUND SURFACES WITHIN <br /> 1-BOD-424-5555. PROJECT EFFORT AS MANDATED BY THE GOVERNING AGENCY. THE CONSTRUCTION AREA AS NECESSARY TO PROVIDE A UNIFORM <br /> SURFACE AND MAINTAIN EXISTING SURFACE DRAINAGE SLOPES. <br /> 19. CONTRACTOR TO DOCUMENT ALL WORK PERFORMED WITH PHOTOGRAPHS 41. THE PROJECT, WHEN COMPLETED, SHALL COMPLY WITH LOCAL SECURITY SN89 <br /> AND SUBMIT TO AT&T.ALONG WITH REDLINED CONSTRUCTION SET. CODES AND TITLE-24 ENERGY CONSERVATION REQUIREMENTS. (TITLE-24 67. CONTRACTOR REPLACE LANDSCAPE VEGETATION THAT WAS DAMAGED <br /> DUE TO CONSTRUCTION, <br /> UCTION,AND TO MODIFY REMAINING IRRIGATION LINES MJKLTEO HEIG - <br /> WHEN APPLICABLE) TO OPERATING CONDITION, PROVIDING FULL COVERAGE TO IMPACTED ;215 MERRILL CREt! ��KWY <br /> 20. CONTRACTOR TO DOCUMENT ALL CHANGES MADE IN THE FIELD BY 42. ALL GLASS AND GLAZING I$TO COMPLY WITH CHAPTER 54 OF THE U.S. AREAS. <br /> MARKING UP (REDLINING) THE APPROVED CONSTRUCTION SET AND EVERETT, WA 98203 <br /> CONSUMER SAFETY COMMISSION - SAFETY STANDARDS FOR <br /> SUBMITTING THE REDLINED SET TO AT&T. UPON COMPLETION. ARCHITECTURAL GLAZING MATERIALS F FR 1428, CFR PART 1201 68. IN THE CASE OF ROOFTOP SOLUTIONS FOR EQUIPMENT AND/OR <br /> ( ) ANTENNA FRAMES WHERE PENETRATION OF EXISTING ROOFING MATERIALS <br /> 21. FOR COLLOCATION SITES: CONTACT TOWER OWNER REPRESENTATIVE AND LOCAL SECURITY REQUIREMENTS. OCCUR, THE GENERAL CONTRACTOR SHALL COORDINATE WITH BUILDING <br /> FOR PARTICIPATION IN BID WALK. 43. NEW CONSTRUCTION ADDED TO EXISTING CONSTRUCTION SHALL MATCH OWNER AND BUILDING ROOFING CONTRACTOR OF RECORD FOR SHEET TIT_E <br /> IN FORM,TEXTURE, FINISH,AND IN MATERIALS EXCEPT AS NOTED IN INSTALLATION, PATCH, REPAIR OR ANY AUGMENTATION TO THE ROOF, <br /> 22. CONTRACTOR IS TO COORDINATE ALL POWER INSTALLATION WITH POWER THE PLANS AND SPECIFICATIONS. AND HAVE THE WORK GUARANTEED UNDER THE ROOFING CONTRACTOR'S GENERAL NOTES <br /> COMPANY AS REQUIRED. CONTRACTOR TO REPORT POWER INSTALLATION WARRANTY FOR MOISTURE PENETRATION OR AND OTHER FUTURE BREACH <br /> COORDINATION SOLUTION(S) TO NETWORK CARRIER REPRESENTATIVE, OF ROOFING INTEGRITY. <br /> PROJECT CONSTRUCTION MANAGER AND ARCHITECT. <br /> 69. ALL WORK TO BE DONE BETWEEN HOURS OF 8:00 AM AND 5:00 PM, _ <br /> 23. ANY SUBSTITUTIONS OF MATERIALS AND/OR EQUIPMENT, MUST BE EXCLUDING HOLIDAYS. L� NUMBER <br /> APPROVED BY AT&T CONSTRUCTION MANAGER. G-1 .0 A .O <br /> JOB N.. SN89 I <br />