Laserfiche WebLink
40 NORTH I AN D <br /> CONTRACTING be EQUIPMENT <br /> 15 October 2014 Page 1 of 1 <br /> City Of Everett <br /> Public Works <br /> Attn: Steve Miller <br /> Associate Engineer <br /> Re: Correction letter dated 7 Sept 2014 <br /> Project Address: 2300 Merrill Creek Parkway <br /> Project# B1409-061 <br /> Dear Mr. Miller: <br /> Herein are the corrections you requested on the above referenced project. <br /> 1. The Epoxy anchor installation inspection is referenced on pages 2/8 and 4/8. <br /> 2. The shear illustration shown on page 7/8 has been clarified by calling out specific walls <br /> shown on page 2/8. "Every" is underlined to note that the steel bracing is to be installed at <br /> both corners on each specified wall. <br /> 3. The requested engineering for the compressor room is shown on page 8/8 and the <br /> calculations are attached. <br /> Please give me a call at 425 299 2376 if any additional information is required. <br /> r incerel <br /> Lip` <br /> � -LJ N H. CARSWELL, SR. 5 2014rector of Operations <br /> r V"E �€ T 7 <br /> 902 15t St. Suite 201,Snohomish, WA 98290 425 350 0645 NORTHDC900PM <br />